Skip to content

Project File

TierPoint Kansas City - Lenexa (LEN)

Lenexa,Johnson County,KansasOperatingLast checked Nov 14, 2026

TierPointOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

TierPoint Kansas City - Lenexa (LEN) is an operating data center project in Lenexa, Johnson County, Kansas. TierPoint is named as operator. No site capacity figure is published for this project.

TierPoint Kansas City - Lenexa (LEN) is an operating data center project in Lenexa, Johnson County, Kansas. TierPoint is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Lenexa, Johnson County, Kansas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

2Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of TierPoint Kansas City - Lenexa (LEN) in Lenexa, Johnson County, Kansas, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Johnson County, Kansas.See every project on the map

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Kansas SB 98: Sales tax exemption for large Kansas data centers

    The act covers qualified firms that invest at least $250 million in eligible data center costs in a qualified data center by the fifth year of operations and create and maintain at least 20 new jobs within two calendar years after operations begin; this project has 5 MW on record (generator capacity), but the project's investment in eligible data center costs and the new jobs it created is not on record.

    “A qualified firm that makes an investment in eligible data center costs in a qualified data center of at least $250,000,000 in the aggregate by the fifth year of operations and creates and maintains at least 20 new jobs at the qualified data center within two calendar years after the commencement of operations shall receive a sales tax exemption, as provided by K.S.A. 79-3606(xxxx), and amendments thereto, and section 3, and amendments thereto, for:” (New Section 2(a), enrolled text)

    Rule checks: Project is in Kansas. Still to check: dates: not checked, who it covers: not checked

Bills and laws in Kansas

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 5 MW · generator_capacity

Public records

2 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is TierPoint Kansas City - Lenexa (LEN)?
TierPoint Kansas City - Lenexa (LEN) is a data center project in Lenexa, Johnson County, Kansas.
Who operates TierPoint Kansas City - Lenexa (LEN)?
TierPoint is named as the operator of TierPoint Kansas City - Lenexa (LEN).
What stage is TierPoint Kansas City - Lenexa (LEN)?
TierPoint Kansas City - Lenexa (LEN) is operating.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    News Release 11-6-25: KCC approves Large Load Power Service rate plan for Evergy
    Kansas Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Sierra Club Supports KCC Approved Plan to Protect Customers
    Sierra Club
    Tier 4 · Captured 2026-11-08 · Open the source
  3. 3
    'Fair Share' or Cross-Subsidy? PSC Staff Broke with Commissioners on Evergy's Data Center Tariff
    ACT4MO
    Tier 4 · Captured 2026-11-08 · Open the source
  4. 4
    What Evergy's Large-Load Tariff Means for Your Electric Bill
    Brian Curry (research analysis)
    Tier 3 · Captured 2026-11-08 · Open the source
  5. 5
    Kansas City - Lenexa (LEN) data center spec sheet
    TierPoint, LLC
    Tier 2 · Captured 2026-11-10 · Open the source
  6. 6
    Kansas City - Lenexa Data Center
    TierPoint, LLC
    Tier 2 · Captured 2026-11-10 · Open the source
  7. 7
    Evergy Files Kansas First Rate Review in Five Years to Recover Investments to Modernize the Power Grid, Increase Reliability and Enhance Customer Service
    Evergy, Inc.
    Tier 4 · Captured 2026-11-14 · Open the source
  8. 8
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page