city Card
Data centers in Lenexa, Kansas
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 4 data center projects in Lenexa, Kansas as of November 2026, totaling about 28 MW announced where a figure is published.
Lenexa has 4 tracked data centers. Their announced capacity totals about 28 MW where a figure is published. Of those, 4 operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Lenexa
- DataBank MCI3 (Kansas City)
OperatingLenexa13 MW announced
- DataBank South Lake Campus (MCI1 and MCI3, Lenexa)
OperatingLenexa13 MW announced
- LightEdge data center, Lenexa (Cavern Technologies underground facility)
OperatingLenexa3 MW announced
- TierPoint Kansas City - Lenexa (LEN)
OperatingLenexa
Who serves this place
- Not collected yet.
More places in Johnson County
Lenexa is part of Johnson County.
Nearby places
- De Soto2 data center projects tracked
- Overland Park2 data center projects tracked
- Shawnee1 data center project tracked
Court cases and commission dockets in Kansas (2)
Bills and laws in Kansas
- SB 400 · Died or failedClosed loop cooling required for large data centers
- SB 526 · Died or failedExemption only for data centers on industrial zoned land
- SB 531 · Died or failedNo new large data centers in drought emergency counties
- SB 98 · Signed into law · Apr 24, 2025Sales tax exemption for large Kansas data centers
- SB 51 · Died or failed · Mar 27, 2025Original data center sales tax exemption bill
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Lenexa?
- Data Center Fact Check tracks 4 data center projects in Lenexa as of November 2026. Of those, 4 operating.
- What is the biggest data center in Lenexa?
- By announced capacity, the biggest data center in Lenexa is DataBank MCI3 (Kansas City), announced at 13 MW. It is operating.
- How much power do data centers in Lenexa use?
- The 4 projects tracked in Lenexa have announced about 28 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Lenexa." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ks-lenexa
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page