Data centers in Overland Park, Kansas
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in Overland Park, Kansas as of November 2026, totaling about 4 MW announced where a figure is published.
Overland Park has 2 tracked data centers. Their announced capacity totals about 4 MW where a figure is published. Of those, 2 operating. The projects here are DataBank MCI2 (Kansas City) and DataBank Pine Ridge Data Center (MCI2, Overland Park). Every figure comes from the public record linked on this page.
Data center projects in Overland Park
- DataBank MCI2 (Kansas City)
OperatingOverland Park2 MW announced
- DataBank Pine Ridge Data Center (MCI2, Overland Park)
OperatingOverland Park2 MW announced
Who serves this place
- Not collected yet.
More places in Johnson County
Overland Park is part of Johnson County.
Court cases and commission dockets in Kansas (2)
Bills and laws in Kansas
- SB 400 · Died or failedClosed loop cooling required for large data centers
- SB 526 · Died or failedExemption only for data centers on industrial zoned land
- SB 531 · Died or failedNo new large data centers in drought emergency counties
- SB 98 · Signed into law · Apr 24, 2025Sales tax exemption for large Kansas data centers
- SB 51 · Died or failed · Mar 27, 2025Original data center sales tax exemption bill
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Overland Park?
- Data Center Fact Check tracks 2 data center projects in Overland Park as of November 2026. Of those, 2 operating.
- What is the biggest data center in Overland Park?
- By announced capacity, the biggest data center in Overland Park is DataBank Pine Ridge Data Center (MCI2, Overland Park), announced at 2 MW. It is operating.
- How much power do data centers in Overland Park use?
- The 2 projects tracked in Overland Park have announced about 4 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Overland Park." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ks-overland-park
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page