Project File
Meta data center, Kansas City (Golden Plains Technology Park)
Kansas City,MissouriOperatingFirst public 2022Filing entity: Velvet Tech Services LLCLast checked Nov 8, 2026
Diode VenturesDeveloperMetaDeveloper and operatorEvergyElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Electric utility
- Confirmed: First public date
- Still to confirm: County
- Still to confirm: Capacity
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Meta data center, Kansas City (Golden Plains Technology Park) is an operating data center project in Kansas City, Missouri. Meta is named as operator. It was first public in 2022. No site capacity figure is published for this project.
Meta data center, Kansas City (Golden Plains Technology Park) is an operating data center project in Kansas City, Missouri. Meta is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Kansas City, Missouri. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Meta data center, Kansas City (Golden Plains Technology Park)Operating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Missouri SB 4: Utility law requiring large load customers to cover their costs
The act covers customers of an electrical corporation serving more than two hundred fifty thousand customers who are reasonably projected to have above an annual peak demand of one hundred megawatts or more; this project has no capacity figure on record, but the project's projected annual peak demand and the customer count of its serving electrical corporation is not on record.
“Each electrical corporation providing electric service to more than two hundred fifty thousand customers shall develop and submit to the commission schedules to include in the electrical corporation's service tariff applicable to customers who are reasonably projected to have above an annual peak demand of one hundred megawatts or more. The schedules should reasonably ensure such customers' rates will reflect the customers' representative share of the costs incurred to serve the customers and prevent other customer classes' rates from reflecting any unjust or unreasonable costs arising from service to such customers.” (Section 393.130, subsection 7, TAFP text (p. 40))
Rule checks: Project is in Missouri. Still to check: size: unknown, who it covers: not checked
Bills and laws in Missouri
- HB 3369 · Died or failed · May 15, 2026One year ban on data center permits in St. Louis
- HB 3362 · Died or failed · May 15, 2026New rules for industrial utility customers
- HB 3390 · Died or failed · May 15, 2026State siting board for hyperscale data centers
- HB 2239 · Died or failed · May 15, 2026AI data center environmental accountability act
- HB 3364 · Died or failed · May 15, 2026New rules for industrial utility customers
- SB 4 · Signed into law · Apr 9, 2025Utility law requiring large load customers to cover their costs
Who's involved
- DeveloperDiode Ventures
- Developer and operatorMeta
- Electric utilityEvergy
Public records
2 records found so far. 8 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Decided · Nov 13, 2025In the matter of Evergy Metro, Inc. and Evergy Missouri West, Inc. large load tariffs (Large Load Power Service)
- Utility commission · Decided · Nov 6, 2025Application of Evergy Kansas Central, Inc. and Evergy Metro, Inc. for approval of a large load power service rate plan (LLPS)
Questions people ask
- Where is Meta data center, Kansas City (Golden Plains Technology Park)?
- Meta data center, Kansas City (Golden Plains Technology Park) is a data center project in Kansas City, Missouri.
- Who operates Meta data center, Kansas City (Golden Plains Technology Park)?
- Meta is named as the operator of Meta data center, Kansas City (Golden Plains Technology Park).
- What stage is Meta data center, Kansas City (Golden Plains Technology Park)?
- Meta data center, Kansas City (Golden Plains Technology Park) is operating. It was first public in 2022.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1News Release 11-6-25: KCC approves Large Load Power Service rate plan for Evergy
Kansas Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 2Sierra Club Supports KCC Approved Plan to Protect Customers
Sierra ClubTier 4 · Captured 2026-11-08 · Open the source - 3'Fair Share' or Cross-Subsidy? PSC Staff Broke with Commissioners on Evergy's Data Center Tariff
ACT4MOTier 4 · Captured 2026-11-08 · Open the source - 4What Evergy's Large-Load Tariff Means for Your Electric Bill
Brian Curry (research analysis)Tier 3 · Captured 2026-11-08 · Open the source - 5Governor Parson Announces Meta Selects Kansas City for New $800 Million Data Center
Office of the Governor of MissouriTier 1 · Captured 2026-11-08 · Open the source - 6Golden Plains Technology Park (project page)
Diode VenturesTier 4 · Captured 2026-11-08 · Open the source - 7
- 8EIA Form 861, Service Territory file, 2025 (final)
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-11 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page