Skip to content

Utility commission

In the matter of Evergy Metro, Inc. and Evergy Missouri West, Inc. large load tariffs (Large Load Power Service)

Where it stands: Decided as of Nov 13, 2025

Draft research, not yet verified. Open a source to check any detail.

What it is

Creates the Large Load Power Service (LLPS) rate class for Evergy's Missouri companies under Section 393.130.7, enacted by Senate Bill 4 (2025). Eligibility begins at 75 MW of new or expanded load, below the 100 MW figure in the statute. The Commission approved a non-unanimous global stipulation (Evergy, Ameren Missouri, Google, the Data Center Coalition, Nucor, Sierra Club, Renew Missouri, and others) and rejected the alternative design backed by Commission Staff and the Office of Public Counsel. Tariffs took effect March 9, 2026. The plan's terms, the same plan Evergy filed in Kansas, are a minimum bill of 80 percent of contract demand, a minimum term of 12 years after a ramp of up to five years, and collateral equal to two years of minimum bills. In Missouri proceedings, Google's rate design witness put the settled LLPS rates about 15 to 17 percent above standard large power rates.

The facts

Regulator
Missouri Public Service Commission
Docket number
EO-2025-0154
Type
Large load tariff
Utility
Evergy Missouri West
State
Missouri
Status date
Nov 13, 2025
Large-load rules
Yes, for loads of 75 MW or more

Related cases and proceedings

Sources

  1. 1
    'Fair Share' or Cross-Subsidy? PSC Staff Broke with Commissioners on Evergy's Data Center Tariff
    ACT4MO
    Tier 4 · ACT4MO analysis of the Report and Order (LLPS class; 75 MW threshold; stipulation approved over Staff and Public Counsel objections); Curry analysis (decided November 13, 2025; tariffs effective March 9, 2026) · Open the source
  2. 2
    What Evergy's Large-Load Tariff Means for Your Electric Bill
    Brian Curry (research analysis)
    Tier 3 · ACT4MO analysis of the Report and Order (LLPS class; 75 MW threshold; stipulation approved over Staff and Public Counsel objections); Curry analysis (decided November 13, 2025; tariffs effective March 9, 2026) · Open the source

Report an error or send a tip on this page

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "In the matter of Evergy Metro, Inc. and Evergy Missouri West, Inc. large load tariffs (Large Load Power Service)." Last activity 2025-11-13. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-evergy-mo-west-llps-2025