Data center court cases and dockets
A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.
211 dockets, page 5 of 6
Cases and proceedings
Utility commissionIn effectLarge loads
Schedule L-25-LL, Large Light and Power, Experimental Large Load Service
Board of the South Carolina Public Service Authority · South Carolina Public Service Authority · South Carolina
Utility commissionIn effectLarge loads
Investigation into New Load Connection Costs (Advice No. 24-38, revisions to Rule C and Rule I)
Public Utility Commission of Oregon · Docket UE 430 · Portland General Electric Co · Oregon
Utility commissionIn effectLarge loads
Schedule PLL-18, Power and Light Large
Georgia Public Service Commission · Georgia Power Company · Georgia
Utility commissionIn effectLarge loads
Application for Approval of Revisions to Schedules LCP and IP (Appalachian Power Company and Wheeling Power Company)
Public Service Commission of West Virginia · Docket 24-0611-E-T-PW · Appalachian Power Co · West Virginia
Utility commissionIn effectLarge loads
Electronic Tariff Filing of Kentucky Power Company to Revise Its Industrial General Service Tariff
Kentucky Public Service Commission · Docket 2024-00305 · Kentucky Power Co · Kentucky
Utility commissionDecidedLarge loads
Application of Nevada Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers
Public Utilities Commission of Nevada · Docket 24-05023 · Nevada Power Co · Nevada
Utility commissionDecidedLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers
Public Utilities Commission of Nevada · Docket 24-05022 · Sierra Pacific Power Co · Nevada
Utility commissionDecidedLarge loads
Proposed Adjustments to SRP's Standard Electric Price Plans Effective with the November 2025 Billing Cycle
Board of Directors, Salt River Project Agricultural Improvement and Power District · Salt River Project · Arizona
Utility commissionDecidedLarge loads
Verified Petition of Indiana Michigan Power Company for Approval of Modifications to Its Industrial Power Tariff, Tariff I.P.
Indiana Utility Regulatory Commission · Docket Cause No. 46097 · Indiana Michigan Power · Indiana
Utility commissionIn effectLarge loads
Rocky Mountain Power Electric Service Schedule No. 400, Special Contract (Idaho)
Idaho Public Utilities Commission · Docket PAC-E-24-04 · PacifiCorp · Idaho
Utility commissionDecidedLarge loads
Order Approving Revisions to Georgia Power Company's Rules and Regulations (large load rules)
Georgia Public Service Commission · Docket 44280 · Georgia Power Company · Georgia
Utility commissionPending before the commissionLarge loads
Alabama Power 2025 Integrated Resource Plan (summary report filed with the Commission)
Alabama Public Service Commission · Alabama
Utility commissionIn effectLarge loads
Schedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
Public Utility Commission of Oregon · PacifiCorp · Oregon
Utility commissionDecidedLarge loads
PacifiCorp Request for a General Rate Revision (2024 general rate case, very large customer charges)
Public Utility Commission of Oregon · Docket UE 433 · PacifiCorp · Oregon
Utility commissionPending before the commissionLarge loads
Order Instituting Rulemaking to Establish Energization Timelines
California Public Utilities Commission · Docket R.24-01-018 · California
Court caseDecided
Indiana Michigan Power large load tariff settlement
Indiana Utility Regulatory Commission · Docket Cause No. 46097 · Indiana
Utility commissionDecidedLarge loads
Public Service Company of Colorado application for approval of a non-standard economic development rate (EDR) contract with QTS Aurora Infrastructure, LLC, and for a determination on a certificate of public convenience and necessity (CPCN) for customer-funded transmission facilities
Colorado Public Utilities Commission · Docket 23A-0330E · Public Service Co of Colorado · Colorado
Utility commissionIn effectLarge loads
Rate Schedule XHLF, General Service, Extra High Load Factor
Arizona Corporation Commission · Docket A.C.C. No. 6067 · Arizona Public Service Company · Arizona
Utility commissionDecidedLarge loads
Application of Virginia Electric and Power Company for a 2023 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
Virginia State Corporation Commission · Docket PUR-2023-00101 · Dominion Energy Virginia · Virginia
Utility commissionIn effectLarge loads
PacifiCorp Advice 23-06, Rule 14 Line Extensions, Tariff WN U-76
Washington Utilities and Transportation Commission · Docket UE-231037 · PacifiCorp · Washington
Utility commissionIn effectLarge loads
PacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy
Public Utility Commission of Oregon · Docket UE 424 · PacifiCorp · Oregon
Court caseDecided
Verified Petition of Duke Energy Indiana, LLC for Approval of a Special Retail Electric Service Agreement, Renewable Energy Purchase Agreement, and Tranche Agreements with Blocke, LLC
Indiana Utility Regulatory Commission · Docket Cause No. 45975 · Clark County · Indiana
About: Meta Jeffersonville Data Center
Utility commissionDecidedLarge loads
Verified Petition of Duke Energy Indiana, LLC for Approval of a Special Retail Electric Service Agreement, Renewable Energy Purchase Agreement, and Tranche Agreements with Blocke, LLC
Indiana Utility Regulatory Commission · Docket Cause No. 45975 · Duke Energy Indiana, LLC · Indiana
Utility commissionIn effectLarge loads
Montana-Dakota Utilities Co., High Density Contracted Demand Response Rate 45 (approval of new electric rate schedule)
North Dakota Public Service Commission · Docket PU-22-337 · Montana-Dakota Utilities · North Dakota
Utility commissionDecidedLarge loads
Application for Approval of Special Contract and Tariff Schedule 33 to Provide Electric Service to Brisbie, LLC's Data Center Facility
Idaho Public Utilities Commission · Docket IPC-E-21-42 · Idaho Power Co · Idaho
Utility commissionIn effectLarge loads
Schedule HV-1, Large Power Dedicated Distribution Service
Virginia State Corporation Commission · Northern Virginia Electric Cooperative · Virginia
Court casePending
Johnson Contractors, Inc. v. Starbelt, LLC et al.
U.S. District Court, Northern District of Alabama, Northeastern Division · Docket Case No. 5:23-cv-28-CLM · Madison County · Alabama
About: Meta Huntsville Data Center
Utility commissionDecidedLarge loads
Joint petition of PGE and QTS Investment Properties Hillsboro, LLC to increase Green Tariff Customer Supply Option capacity (GEAR, Schedule 55)
Public Utility Commission of Oregon · Docket UM 2202 · Portland General Electric Co · Oregon
Utility commissionDecidedLarge loads
Application of Mecklenburg Electric Cooperative for approval of a special rate (Schedule RTO)
Virginia State Corporation Commission · Docket PUR-2021-00059 · Mecklenburg Electric Cooperative · Virginia
Court caseSettled
City of The Dalles v. The Oregonian (Google water records)
Wasco County Circuit Court (Oregon) · Docket 21CV40820 · Wasco County · Oregon
About: Google The Dalles data center campus
Utility commissionDecidedLarge loads
Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)
Public Utilities Commission of Nevada · Docket 16-09023 · Nevada Power Co · Nevada
Utility commissionDecidedLarge loads
Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)
Public Utilities Commission of Nevada · Docket 16-09023 · Sierra Pacific Power Co · Nevada
Utility commissionDecidedLarge loads
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc.
Public Utilities Commission of Nevada · Docket 15-11025 · Sierra Pacific Power Co · Nevada
Utility commissionDecidedLarge loads
Application of Switch Ltd. for Leave to Exit the System of Nevada Power Company d/b/a NV Energy in Accordance with the Provisions of NRS Chapter 704B and NAC Chapter 704B
Public Utilities Commission of Nevada · Docket 14-11007 · Nevada Power Co · Nevada
Court caseDecided
Board of County Supervisors of Prince William County et al. v. Oak Valley Homeowners Association, Inc., et al. (Digital Gateway rezonings)
Court of Appeals of Virginia · Docket Record Nos. 1584-25-4, 1590-25-4, 1592-25-4, and 2025-24-4 · Prince William County · Virginia
About: Prince William Digital Gateway
Utility commissionDecidedLarge loads
Dakota Electric Association, modified Extension of Service Tariff for extraordinarily large and system-intensive members
Minnesota Public Utilities Commission · Docket 25-178 · Dakota Electric Association · Minnesota
Utility commissionPending before the commissionLarge loads
Dakota Electric Association, proposed Very Large Member Contract Rate Service tariff
Minnesota Public Utilities Commission · Docket 26-243 · Dakota Electric Association · Minnesota
Court casePending
Gerber et al. v. Board of Supervisors of Middlesex Township (land use appeal of the July 1, 2026 approvals)
Court of Common Pleas of Cumberland County, Pennsylvania · Docket 2026-08652 Civil Term · Middlesex Township · Pennsylvania
About: Pennsylvania Digital I (PAX-1)
Utility commissionPending before the commissionLarge loads
IN THE MATTER OF THE APPLICATION OF ENTERGY ARKANSAS, LLC’S GENERATING ARKANSAS JOBS ACT ANNUAL UPDATES
Arkansas Public Service Commission · Docket 26-008-TF · Entergy Arkansas LLC · Arkansas
Utility commissionDecidedLarge loads
Interstate Power and Light Company, individual customer rate service agreements for the Big Cedar Industrial Center data centers (Google and QTS), Cedar Rapids
Iowa Utilities Commission · Alliant Energy (Interstate Power and Light) · Iowa
Sources on this page
- 1Schedule L-25-LL, Large Light and Power, Experimental Large Load Service (adopted April 25, 2025)
South Carolina Public Service AuthorityTier 1 · Draft research, not yet verified · Open the source - 2Staff Report, Portland General Electric Investigation into New Load Connection Costs, Docket UE 430 / Advice No. 24-38
Staff of the Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 3Schedule PLL-18, Power and Light Large
Georgia Power CompanyTier 1 · Draft research, not yet verified · Open the source - 4Tariff filing with corrected Schedules L.C.P. and I.P. sheets, Case No. 24-0611-E-T-PW (filed April 7, 2025)
Public Service Commission of West VirginiaTier 1 · Draft research, not yet verified · Open the source - 5Final Order, Case No. 2024-00305, Kentucky Power Company Industrial General Service tariff revisions (March 18, 2025)
Kentucky Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 6PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · Draft research, not yet verified · Open the source - 7The PUCN Connection newsletter, April 2026 edition
Public Utilities Commission of NevadaTier 1 · Draft research, not yet verified · Open the source - 8Notice of Changes to SRP Standard Electric Price Plans
Salt River ProjectTier 1 · Draft research, not yet verified · Open the source - 9Management Recommendations for the February 27, 2025 Special Board Meeting
Salt River ProjectTier 1 · Draft research, not yet verified · Open the source - 10Regulatory and Policy Digest: Indiana commission approves settlement with new rules for large loads
Electric Power Research InstituteTier 2 · Draft research, not yet verified · Open the source - 11Indiana Michigan Power Receives Order in Large Load Settlement
American Electric PowerTier 4 · Draft research, not yet verified · Open the source - 12Rocky Mountain Power Idaho Electric Service Schedule No. 400, Special Contract (I.P.U.C. No. 1, Thirteenth Revision of Sheet No. 400.1)
Rocky Mountain Power (PacifiCorp)Tier 1 · Draft research, not yet verified · Open the source - 13Final Order No. 35277, Case No. PAC-E-21-07 (Rocky Mountain Power Idaho rate case)
Idaho Public Utilities CommissionTier 1 · Draft research, not yet verified · Open the source - 14Order Approving Revisions to Georgia Power Company's Rules and Regulations, Docket No. 44280, with the PSC news release of January 23, 2025 (Exhibits Q and P)
Georgia Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 152025 Integrated Resource Plan, Summary Report
Alabama Power CompanyTier 2 · Draft research, not yet verified · Open the source - 16Schedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
PacifiCorp d/b/a Pacific PowerTier 1 · Draft research, not yet verified · Open the source - 17PUC Cuts PacifiCorp's Requested January 1 General Rate Increase (UE 433 decision release)
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 18Staff Opening Testimony (Staff/100), Docket UE 463
Staff of the Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 19Data Center Coalition Opening Testimony of Bieber, Docket UE 463
Data Center Coalition (filed in Public Utility Commission of Oregon Docket UE 463)Tier 1 · Draft research, not yet verified · Open the source - 20CPUC proceeding details: R.24-01-018 (Order Instituting Rulemaking to Establish Energization Timelines)
California Public Utilities Commission (apps.cpuc.ca.gov)Tier 1 · Draft research, not yet verified · Open the source - 21Decision 24-09-020: Decision Establishing Target Energization Time Periods and Procedure for Customers to Report Energization Delays (R.24-01-018)
California Public Utilities Commission (docs.cpuc.ca.gov)Tier 1 · Draft research, not yet verified · Open the source - 22Final Order in Cause No. 46097 (Indiana Michigan Power large load tariff)
Indiana Utility Regulatory CommissionTier 1 · Draft research, not yet verified · Open the source - 23Decision No. C24-0378, Proceeding No. 23A-0330E (QTS non-standard EDR contract)
Colorado Public Utilities CommissionTier 1 · Draft research, not yet verified · Open the source - 24Rate Schedule XHLF, General Service, Extra High Load Factor (A.C.C. No. 6067)
Arizona Public Service CompanyTier 1 · Draft research, not yet verified · Open the source - 25Virginia Electric and Power Company Entire Filed Tariff (revised June 1, 2026)
Dominion Energy VirginiaTier 1 · Draft research, not yet verified · Open the source - 26UTC Case Docket Detail Page, Docket UE-231037 (PacifiCorp, Advice 23-06)
Washington Utilities and Transportation CommissionTier 1 · Draft research, not yet verified · Open the source - 27PacifiCorp Advice 23-06 cover letter and Rule 14 tariff sheets, Docket UE-231037
PacifiCorp d/b/a Pacific Power & Light Company (filed with the Washington Utilities and Transportation Commission)Tier 1 · Draft research, not yet verified · Open the source - 28Order No. 23-472, PacifiCorp Revision of Rule 13 Line Extension Policy, Docket UE 424
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 29Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities
Lawrence Berkeley National LaboratoryTier 2 · Draft research, not yet verified · Open the source - 30Case PU-22-337 Detail (Montana-Dakota Utilities Co., High Density Contracted Demand Response)
North Dakota Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 31Compliance Filing, Case No. PU-22-194: High Density Contracted Demand Response Rate 45 tariff sheets
North Dakota Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 32Direct Testimony of Nicole A. Kivisto, Case No. PU-26-241 (Montana-Dakota Utilities Co. electric rate case)
North Dakota Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 33Final Order No. 35777, Case No. IPC-E-21-42 (Idaho Power special contract and Tariff Schedule 33 for Brisbie, LLC)
Idaho Public Utilities CommissionTier 1 · Draft research, not yet verified · Open the source - 34Schedule HV-1, Large Power Dedicated Distribution Service
Northern Virginia Electric CooperativeTier 1 · Draft research, not yet verified · Open the source - 35Memorandum Opinion, Johnson Contractors, Inc. v. Starbelt, LLC et al., Case No. 5:23-cv-28-CLM, Document 163 (N.D. Ala., December 9, 2025)
U.S. District Court for the Northern District of Alabama (opinion as published on govinfo, U.S. Courts Opinions collection)Tier 1 · Draft research, not yet verified · Open the source - 36Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity (UM 2202)
Public Utility Commission of Oregon (joint filing of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC)Tier 1 · Draft research, not yet verified · Open the source - 37Order No. 21-468, UM 2202 (entered December 20, 2021)
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 38Order Granting Approval, Case No. PUR-2021-00059 (Mecklenburg Electric Cooperative special rate, Schedule RTO)
Virginia State Corporation CommissionTier 1 · Draft research, not yet verified · Open the source - 39Good day for journalism: The Dalles, Google abdicate in water fight with Oregonian
Columbia InsightTier 3 · Draft research, not yet verified · Open the source - 40Total City and Google Water Consumption (gal.), current as of January 21, 2026
City of The DallesTier 1 · Draft research, not yet verified · Open the source - 41Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)Tier 2 · Draft research, not yet verified · Open the source - 42First Solar, NV Energy and Switch Partner on New 100 Percent Green, Renewable Energy Program (July 14, 2015)
NV Energy (company newsroom)Tier 4 · Draft research, not yet verified · Open the source - 43Board of County Supervisors of Prince William County v. Oak Valley Homeowners Association, Inc., et al., opinion (Record Nos. 1584-25-4, 1590-25-4, 1592-25-4, 2025-24-4)
Court of Appeals of VirginiaTier 1 · Draft research, not yet verified · Open the source - 44Very large electric customers and the PUC process
Minnesota Public Utilities CommissionTier 1 · Draft research, not yet verified · Open the source - 45Petition for Stay of the Actions Appealed Pursuant to 53 P.S. 11003-A(d), No. 2026-06465 Civil Term
Court of Common Pleas of Cumberland County (appellants' filing)Tier 1 · Draft research, not yet verified · Open the source - 46Attorney General brief in response to Order No. 4 (Doc. 59), Docket No. 26-008-TF, Generating Arkansas Jobs Act annual updates
Arkansas Public Service CommissionTier 1 · Draft research, not yet verified · Open the source - 47Iowa's Electricity Affordability Divide: What Alliant's Rates and the Data Center Boom Mean for Iowa Consumers
Clean Energy Districts of IowaTier 2 · Draft research, not yet verified · Open the source