Skip to content

Project File

Equinix MI1 (Miami)

Miami,Miami-Dade County,FloridaOperatingFirst public 2026Last checked Nov 14, 2026

EquinixOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Equinix MI1 (Miami) is an operating data center project in Miami, Miami-Dade County, Florida. Equinix is named as operator. It was first public in 2026. No site capacity figure is published for this project.

Equinix MI1 (Miami) is an operating data center project in Miami, Miami-Dade County, Florida. Equinix is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Miami, Miami-Dade County, Florida. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Equinix MI1 (Miami) in Miami, Miami-Dade County, Florida, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Miami-Dade County, Florida.See every project on the map

Timeline

  1. · New projectFirst public record of Equinix MI1 (Miami)Operating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Florida HB 7031: Extends data center sales tax exemption, raises bar to 100 megawatts

    The act covers data centers whose owners and tenants make a cumulative capital investment of $150 million or more and reach a critical IT load of 100 megawatts or higher, with 1 megawatt or more per owner or tenant, no later than five years after construction begins, for the sales tax exemption; this project has no capacity figure on record, but the project's cumulative capital investment and its critical IT load is not on record. Status part: the bill's status (Approved by Governor; Chapter No. 2025-208) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “To be eligible for the exemption provided by this paragraph, the data center's owners and tenants must make a cumulative capital investment of $150 million or more for the data center and the data center must have a critical IT load of 100 megawatts or higher and a critical IT load of 1 megawatt or higher dedicated to each individual owner or tenant within the data center. Each of these requirements must be satisfied no later than 5 years after the commencement of construction of the data center.” (Section 46, s. 212.08(5)(r), Florida Statutes)

    Rule checks: Project is in Florida. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Florida SB 484: Makes large data centers pay full power and water costs

    The act covers large load customers of public utilities, customers with an anticipated monthly peak load of 50 megawatts or more at a single location, who must bear their own full cost of service; this project has no capacity figure on record, but the project's anticipated monthly peak load at a single location is not on record. Status part: the bill's status (Approved by Governor; Chapter No. 2026-65) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “'Large load customer' means a customer with an anticipated monthly peak load of 50 megawatts or more, calculated as the highest average load over a 15-minute interval at a single location.” (s. 366.043(2)(d), Florida Statutes)

    Rule checks: Project is in Florida. Still to check: size: unknown, dates: not checked, who it covers: not checked

Bills and laws in Florida

All 7 in Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Equinix MI1 (Miami)?
    Equinix MI1 (Miami) is a data center project in Miami, Miami-Dade County, Florida.
    Who operates Equinix MI1 (Miami)?
    Equinix is named as the operator of Equinix MI1 (Miami).
    What stage is Equinix MI1 (Miami)?
    Equinix MI1 (Miami) is operating. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Equinix data center locations (operator’s own list)
      Equinix
      Tier 2 · Captured 2026-11-10 · Open the source
    2. 2
      Miami MI1 Data Center
      Equinix
      Tier 4 · Captured 2026-11-14 · Open the source
    3. 3
      Cogent Service Locations: Miami
      Cogent Communications
      Tier 4 · Captured 2026-11-14 · Open the source
    4. 4
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page