Data Center Fact Check tracks 7 data center projects in Miami-Dade County, Florida as of November 2026: 6 operating and 1 under construction, totaling about 18 MW announced where a figure is published.
Miami-Dade County has 7 tracked data centers. Their announced capacity totals about 18 MW where a figure is published. Of those, 6 operating and 1 under construction. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Miami-Dade County
- DataBank MIA1 (Miami)
OperatingMiami2 MW announced
- Digital Realty MIA10 (Miami)
OperatingMiami
- Equinix MI1 (Miami)
OperatingMiami
- Equinix MI2 (Miami)
OperatingMiami
- Equinix MI6 (Miami)
OperatingDoral
- Iron Mountain Miami
Under constructionMiami16 MW announced
- QTS Miami
OperatingMiami
Who serves this place
- Not collected yet.
Places in and around Miami-Dade County
Miami-Dade County is part of Florida.
Nearby places
- Polk County3 data center projects tracked
- Duval County2 data center projects tracked
- Palm Beach County2 data center projects tracked
- DeSoto County1 data center project tracked
- Hillsborough County1 data center project tracked
- Nassau County1 data center project tracked
Court cases and commission dockets in Florida (6)
Bills and laws in Florida
- SB 484 · In effect · Jul 1, 2026Makes large data centers pay full power and water costs
- HB 1517 · Died or failed · Mar 13, 2026Requires state approval and public disclosure for data center facilities
- SB 1118 · Died or failed · Mar 13, 2026Hides data center siting information from public records for a year
- HB 1007 · Died or failed · Mar 11, 2026Sets data center rules, replaced by Senate companion bill
- HB 7031 · In effect · Jul 1, 2025Extends data center sales tax exemption, raises bar to 100 megawatts
- SB 1264 · Died or failed · Jun 16, 2025Repeals expiration of the data center sales tax exemption
- HB 1125 · Died or failed · May 3, 2025Removes sunset on data center sales tax exemption in commerce bill
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Miami-Dade County?
- Data Center Fact Check tracks 7 data center projects in Miami-Dade County as of November 2026. Of those, 6 operating and 1 under construction.
- What is the biggest data center in Miami-Dade County?
- By announced capacity, the biggest data center in Miami-Dade County is Iron Mountain Miami, announced at 16 MW. It is under construction.
- How much power do data centers in Miami-Dade County use?
- The 7 projects tracked in Miami-Dade County have announced about 18 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Miami-Dade County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-fl-miami-dade
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page