CoreSite Denver data centers (DE1, DE2)

Denver,Denver County,ColoradoOperatingFirst public 2012Filing entity: CoreSiteLast checked Nov 8, 2026

CoreSiteOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Electric utility
  • Confirmed: First public date
  • Still to confirm: Capacity
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

CoreSite Denver data centers (DE1, DE2) is an operating data center project in Denver, Denver County, Colorado. CoreSite is named as operator. It was first public in 2012. No site capacity figure is published for this project.

CoreSite Denver data centers (DE1, DE2) is an operating data center project in Denver, Denver County, Colorado. CoreSite is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Denver, Denver County, Colorado. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

3Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of CoreSite Denver data centers (DE1, DE2) in Denver, Denver County, Colorado, captured 2019
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2019Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Denver County, Colorado.See every project on the map

Timeline

  1. · New projectFirst public record of CoreSite Denver data centers (DE1, DE2)Operating

Bills and laws in Colorado

Open Bill Watch

Who's involved

Public records

3 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is CoreSite Denver data centers (DE1, DE2)?
CoreSite Denver data centers (DE1, DE2) is a data center project in Denver, Denver County, Colorado.
Who operates CoreSite Denver data centers (DE1, DE2)?
CoreSite is named as the operator of CoreSite Denver data centers (DE1, DE2).
What stage is CoreSite Denver data centers (DE1, DE2)?
CoreSite Denver data centers (DE1, DE2) is operating. It was first public in 2012.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Electric Rate Cases (Xcel Large Load Tariff, Proceeding No. 26AL-0137E)
    Colorado Public Utilities Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Decision No. C24-0378, Proceeding No. 23A-0330E (QTS non-standard EDR contract)
    Colorado Public Utilities Commission
    Tier 1 · Captured 2026-11-10 · Open the source
  3. 3
    2025 JTS Written Order summary, Proceeding No. 24A-0442E
    Colorado Public Utilities Commission
    Tier 1 · Captured 2026-11-10 · Open the source
  4. 4
    DE1 Denver data center
    CoreSite
    Tier 4 · Captured 2026-11-08 · Open the source
  5. 5
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source
  6. 6
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page