Data centers in Ector County, Texas

Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 2 data center projects in Ector County, Texas as of November 2026: 1 announced and 1 operating, totaling about 1,207 MW announced where a figure is published.

Ector County has 2 tracked data centers. Their announced capacity totals about 1,207 MW where a figure is published. Of those, 1 announced and 1 operating. The projects here are Cipher Odessa and Texas Critical Data Centers (TCDC). Every figure comes from the public record linked on this page.

2Data center projects we track

Data center projects in Ector County

Who serves this place

  • Not collected yet.

A data center is proposed in Ector County

1 project here is at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.

Open the resident checklist

Places in and around Ector County

Ector County is part of Texas.

Cities and towns

  • Odessa2 data center projects tracked

Nearby places

Court cases and commission dockets in Texas (18)

Bills and laws in Texas

Open Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in Ector County?
Data Center Fact Check tracks 2 data center projects in Ector County as of November 2026. Of those, 1 announced and 1 operating.
What is the biggest data center in Ector County?
By announced capacity, the biggest data center in Ector County is Texas Critical Data Centers (TCDC), announced at 1,000 MW. It is announced.
How much power do data centers in Ector County use?
The 2 projects tracked in Ector County have announced about 1,207 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

    Cite this page

    Copy this citation when you reuse a figure or a finding from this page.

    Data Center Fact Check. "Ector County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-tx-ector

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page