Project File
Cipher Odessa
Odessa,Ector County,TexasOperatingFirst public 2023Filing entity: Cipher Mining Technologies Inc.Last checked Nov 13, 2026
CipherOperator and owner or equity partner
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
6 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Cipher Odessa is an operating data center project in Odessa, Ector County, Texas. Cipher is named as operator. It was first public in 2023. It was announced at 207 MW.
Cipher Odessa is an operating data center project in Odessa, Ector County, Texas. Cipher is named as operator. It was announced at 207 MW. All six of the core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Odessa, Ector County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · FilingFiled with Texas Comptroller of Public Accounts for Cipher OdessaDC453534
- · New projectFirst public record of Cipher OdessaOperating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas
The standards must apply only to customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has 207 MW on record (IT load), but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record.
“The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))
Rule checks: Project is in Texas; 207 MW on record (it load), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
- Operator and owner or equity partnerCipher
Power
Capacity, as announced or filed
- 207 MW · Nov 2026 · it_load
Public records
1 records found so far. 8 kinds of record are still being collected.
See every recordQuestions people ask
- Where is Cipher Odessa?
- Cipher Odessa is a data center project in Odessa, Ector County, Texas.
- Who operates Cipher Odessa?
- Cipher is named as the operator of Cipher Odessa.
- How big is Cipher Odessa?
- Cipher Odessa was announced at 207 MW of capacity. The site covers 52 acres.
- What stage is Cipher Odessa?
- Cipher Odessa is operating. It was first public in 2023.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Data Centers in Texas: lists of all registered Qualifying Data Centers and Qualifying Large Data Center Projects
Texas Comptroller of Public AccountsTier 1 · Captured 2026-11-09 · Open the source · Archived copy - 2
- 3Cipher Digital Inc., Form 10-K for the fiscal year ended December 31, 2025
Cipher Digital Inc.Tier 4 · Captured 2026-11-13 · Open the source · Archived copy - 4Second Amendment to Power Purchase Agreement, Luminant ET Services Company LLC and Cipher Mining Technologies Inc. (Exhibit 10.35)
Cipher Mining Inc. (SEC filing exhibit)Tier 4 · Captured 2026-11-13 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page