County Card
Data centers in Briscoe County, Texas
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in Briscoe County, Texas as of November 2026, totaling about 50 MW announced where a figure is published.
Briscoe County has 1 tracked data center project. Their announced capacity totals about 50 MW where a figure is published. The project here is Soluna and Applied Digital Project Dorothy 3, proposed. Every figure comes from the public record linked on this page.
Data center projects in Briscoe County
- Soluna and Applied Digital Project Dorothy 3
ProposedSilverton50 MW announced
Who serves this place
- Not collected yet.
A data center is proposed in Briscoe County
1 project here is at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around Briscoe County
Briscoe County is part of Texas.
Cities and towns
- Silverton1 data center project tracked
Nearby places
- Dallas County36 data center projects tracked
- Bexar County16 data center projects tracked
- Collin County10 data center projects tracked
- Harris County9 data center projects tracked
- Denton County7 data center projects tracked
- Ellis County7 data center projects tracked
- Medina County6 data center projects tracked
- Tarrant County6 data center projects tracked
- Haskell County3 data center projects tracked
- Pecos County3 data center projects tracked
- Reeves County3 data center projects tracked
- Williamson County3 data center projects tracked
Court cases and commission dockets in Texas (18)
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Briscoe County?
- Data Center Fact Check tracks 1 data center project in Briscoe County as of November 2026.
- What is the biggest data center in Briscoe County?
- By announced capacity, the biggest data center in Briscoe County is Soluna and Applied Digital Project Dorothy 3, announced at 50 MW. It is proposed.
- How much power do data centers in Briscoe County use?
- The 1 projects tracked in Briscoe County have announced about 50 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Briscoe County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-tx-briscoe
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page