Project File
Soluna and Applied Digital Project Dorothy 3
Silverton,Briscoe County,TexasProposedFirst public 2026Last checked Nov 8, 2026
SolunaDeveloperApplied DigitalDeveloper
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Soluna and Applied Digital Project Dorothy 3 is a proposed data center project in Silverton, Briscoe County, Texas. Soluna is named as developer. It was first public in 2026. It was announced at 50 MW.
Soluna and Applied Digital Project Dorothy 3 is a proposed data center project in Silverton, Briscoe County, Texas. Soluna is named as developer. It was announced at 50 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Silverton, Briscoe County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of Soluna and Applied Digital Project Dorothy 3Proposed
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
- DeveloperSoluna
- DeveloperApplied Digital
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Soluna and Applied Digital Project Dorothy 3?
- Soluna and Applied Digital Project Dorothy 3 is a data center project in Silverton, Briscoe County, Texas.
- Who is developing Soluna and Applied Digital Project Dorothy 3?
- Soluna is named as the developer of Soluna and Applied Digital Project Dorothy 3.
- How big is Soluna and Applied Digital Project Dorothy 3?
- Soluna and Applied Digital Project Dorothy 3 was announced at 50 MW of capacity. The site covers 397 acres.
- What stage is Soluna and Applied Digital Project Dorothy 3?
- Soluna and Applied Digital Project Dorothy 3 is proposed. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Soluna Holdings Form 8-K and press release (Project Dorothy 3 joint venture with Applied Digital)
Soluna Holdings, Inc. (SEC Form 8-K)Tier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page