County Card
Data centers in Lancaster County, Nebraska
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 4 data center projects in Lancaster County, Nebraska as of November 2026: 2 proposed, 1 approved and 1 operating, totaling about 1,735 MW announced where a figure is published.
Lancaster County has 4 tracked data centers. Their announced capacity totals about 1,735 MW where a figure is published. Of those, 2 proposed, 1 approved and 1 operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Lancaster County
- Coffee Grounds Data (Arevia Power) Malcolm site
ProposedMalcolm
- Google Lincoln data center
OperatingLincoln
- Monolith and Crusoe Hallam data center
ApprovedHallam35 MW announced
- Sagebrush and Stark Power Hallam campus
ProposedHallam1,700 MW announced
Who serves this place
- Not collected yet.
A data center is proposed in Lancaster County
2 projects here are at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around Lancaster County
Lancaster County is part of Nebraska.
Cities and towns
Nearby places
- Sarpy County9 data center projects tracked
- Douglas County4 data center projects tracked
- Buffalo County3 data center projects tracked
- Hall County3 data center projects tracked
- Lincoln County2 data center projects tracked
- Stanton County2 data center projects tracked
- Cass County1 data center project tracked
- Kearney County1 data center project tracked
Bills and laws in Nebraska
- EO 26-17 · In effect · Jul 21, 2026Ends ImagiNE Act tax incentives for new data centers and creates a data center task force
- LB 1064 · Died or failed · Apr 17, 2026Interconnection standards for large load customers
- LB 1111 · Died or failed · Apr 17, 2026Annual reporting and full cost rates for large data centers
- LB 1131 · Died or failed · Apr 17, 2026Ends data center tax exemptions to fund victim services credits
- LB 1010 · Signed into law · Apr 14, 2026Sets connection standards and reporting for large load customers
- LB 1261 · Signed into law · Apr 14, 2026Lets very large loads build their own power plants that public power cannot take by eminent domain
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Lancaster County?
- Data Center Fact Check tracks 4 data center projects in Lancaster County as of November 2026. Of those, 2 proposed, 1 approved and 1 operating.
- What is the biggest data center in Lancaster County?
- By announced capacity, the biggest data center in Lancaster County is Sagebrush and Stark Power Hallam campus, announced at 1,700 MW. It is proposed.
- How much power do data centers in Lancaster County use?
- The 4 projects tracked in Lancaster County have announced about 1,735 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Lancaster County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ne-lancaster
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page