County Card
Data centers in Hall County, Nebraska
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 3 data center projects in Hall County, Nebraska as of November 2026: 2 operating and 1 cancelled, totaling about 12 MW announced where a figure is published.
Hall County has 3 tracked data centers. Their announced capacity totals about 12 MW where a figure is published. Every figure comes from the public record linked on this page.
Data center projects in Hall County
- ArchGreen Doniphan data center (permit denied)
Cancelled
- ArchGreen Grand Island data center (Project 1)
OperatingGrand Island
- Fortitude Mining Grand Island data center
OperatingGrand Island12 MW announced
Who serves this place
- Not collected yet.
Places in and around Hall County
Hall County is part of Nebraska.
Cities and towns
- Grand Island2 data center projects tracked
Nearby places
- Sarpy County9 data center projects tracked
- Douglas County4 data center projects tracked
- Lancaster County4 data center projects tracked
- Buffalo County3 data center projects tracked
- Lincoln County2 data center projects tracked
- Stanton County2 data center projects tracked
- Cass County1 data center project tracked
- Kearney County1 data center project tracked
Bills and laws in Nebraska
- EO 26-17 · In effect · Jul 21, 2026Ends ImagiNE Act tax incentives for new data centers and creates a data center task force
- LB 1064 · Died or failed · Apr 17, 2026Interconnection standards for large load customers
- LB 1111 · Died or failed · Apr 17, 2026Annual reporting and full cost rates for large data centers
- LB 1131 · Died or failed · Apr 17, 2026Ends data center tax exemptions to fund victim services credits
- LB 1010 · Signed into law · Apr 14, 2026Sets connection standards and reporting for large load customers
- LB 1261 · Signed into law · Apr 14, 2026Lets very large loads build their own power plants that public power cannot take by eminent domain
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Hall County?
- Data Center Fact Check tracks 3 data center projects in Hall County as of November 2026. Of those, 2 operating and 1 cancelled.
- What is the biggest data center in Hall County?
- By announced capacity, the biggest data center in Hall County is Fortitude Mining Grand Island data center, announced at 12 MW. It is operating.
- How much power do data centers in Hall County use?
- The 3 projects tracked in Hall County have announced about 12 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Hall County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ne-hall
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page