Data center court cases and dockets
A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.
Showing one project: DataBank Granite Point Campus
12 dockets
Cases and proceedings
Utility commissionPending before the commissionLarge loads
PacifiCorp Advice No. 25-015, Schedule 401, Service to New Large Energy Use Facilities
Public Utility Commission of Oregon · Docket UE 463 · PacifiCorp · Oregon
Utility commissionPending before the commissionLarge loads
Amazon Data Services, Inc. v. PacifiCorp d/b/a Pacific Power
Public Utility Commission of Oregon · Docket UM 2410 · PacifiCorp · Oregon
Utility commissionPending before the commissionLarge loads
Division of Public Utilities' Request for an Investigatory Docket Regarding Rocky Mountain Power's Line Extension Policy for Large Loads
Public Service Commission of Utah · Docket 24-035-43 · PacifiCorp · Utah
Utility commissionDecidedLarge loads
Application of Rocky Mountain Power for Approval of Large-Load Service Contract between PacifiCorp and a Large-Load Customer
Public Service Commission of Utah · Docket 26-035-05 · PacifiCorp · Utah
Utility commissionIn effectLarge loads
Proposed Rulemaking Concerning Utah Code Sections 54-26-101 to -901, Large-Scale Electric Service Requirements
Public Service Commission of Utah · Docket 25-R318-01 · PacifiCorp · Utah
Utility commissionIn effectLarge loads
Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
Washington Utilities and Transportation Commission · Docket UE-250224 · PacifiCorp · Washington
Utility commissionIn effectLarge loads
Rocky Mountain Power Electric Service Schedule No. 400, Special Contracts (Wyoming)
Wyoming Public Service Commission · Docket 20000-671-ER-24 · PacifiCorp · Wyoming
Utility commissionIn effectLarge loads
Rocky Mountain Power Electric Service Schedule No. 400, Special Contract (Idaho)
Idaho Public Utilities Commission · Docket PAC-E-24-04 · PacifiCorp · Idaho
Utility commissionIn effectLarge loads
Schedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
Public Utility Commission of Oregon · PacifiCorp · Oregon
Utility commissionDecidedLarge loads
PacifiCorp Request for a General Rate Revision (2024 general rate case, very large customer charges)
Public Utility Commission of Oregon · Docket UE 433 · PacifiCorp · Oregon
Utility commissionIn effectLarge loads
PacifiCorp Advice 23-06, Rule 14 Line Extensions, Tariff WN U-76
Washington Utilities and Transportation Commission · Docket UE-231037 · PacifiCorp · Washington
Utility commissionIn effectLarge loads
PacifiCorp Advice No. 23-016, Revision of Oregon Rule 13 Line Extension Policy
Public Utility Commission of Oregon · Docket UE 424 · PacifiCorp · Oregon
Sources on this page
- 1Alliance of Western Energy Consumers filing in Docket No. UE 463
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 2PacifiCorp Surrebuttal Testimony of Robert M. Meredith, Docket No. UE 463, with Exhibit PAC/301 (Revised Schedule 401)
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 3Stipulation, Docket No. UE 463, Advice No. 25-015, Schedule 401
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 4ALJ Ruling, Docket UM 2410 (Amazon Data Services, Inc. v. PacifiCorp)
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 5Third Joint Status Report and Motion to Extend Suspension of Procedural Schedule, Docket UM 2410
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 6Notice of Comment Period, Docket Nos. 25-R318-01 and 24-035-43 (large load flexible tariff guidance; R746-318 New Rule)
Public Service Commission of UtahTier 1 · Draft research, not yet verified · Open the source - 7Settlement Stipulation, Docket No. 26-035-05, Application of Rocky Mountain Power for Approval of Large-Load Service Contract between PacifiCorp and a Large-Load Customer
Public Service Commission of Utah (filing by Rocky Mountain Power with the Division of Public Utilities and the Office of Consumer Services)Tier 1 · Draft research, not yet verified · Open the source - 8Notice of Decisions on UAE motion and approval of the Settlement Stipulation, Docket No. 26-035-05
Public Service Commission of UtahTier 1 · Draft research, not yet verified · Open the source - 9Rocky Mountain Power advances Utah's Operation Gigawatt through landmark energy agreement
Rocky Mountain Power (PacifiCorp)Tier 4 · Draft research, not yet verified · Open the source - 10Memorandum to service list in Docket No. 25-R318-01 with Charles River Associates clarification and guidance on the initial SB 132 rules
Public Service Commission of UtahTier 1 · Draft research, not yet verified · Open the source - 11Utah Code Title 54, Chapter 26, Part 1, General Provisions (Large-Scale Electric Service Requirements), effective May 7, 2025
Utah State LegislatureTier 1 · Draft research, not yet verified · Open the source - 12Utah Code Section 54-26-301, Large load contract requirements, effective May 7, 2025
Utah State LegislatureTier 1 · Draft research, not yet verified · Open the source - 13Schedule 48T, Large General Service, Metered Time of Use, 1,000 kW and Over (Tariff WN U-76)
PacifiCorp d/b/a Pacific Power & Light CompanyTier 1 · Draft research, not yet verified · Open the source - 14Rocky Mountain Power Wyoming Electric Service Schedule No. 400, Special Contracts (P.S.C. Wyoming No. 19, Original Sheets 400-1 to 400-3)
Rocky Mountain Power (PacifiCorp)Tier 1 · Draft research, not yet verified · Open the source - 15Public notice of Rocky Mountain Power application to establish Tariff Schedule 400, Special Contracts, Docket No. 20000-602-ET-21 (legal notice as published July 13, 2021)
Wyoming Public Service Commission (notice published in the Kemmerer Gazette)Tier 1 · Draft research, not yet verified · Open the source - 16PacifiCorp Reply Testimony of Craig M. Eller, Oregon Docket No. UE 463, Exhibit PAC/200
PacifiCorpTier 1 · Draft research, not yet verified · Open the source - 17Rocky Mountain Power Idaho Electric Service Schedule No. 400, Special Contract (I.P.U.C. No. 1, Thirteenth Revision of Sheet No. 400.1)
Rocky Mountain Power (PacifiCorp)Tier 1 · Draft research, not yet verified · Open the source - 18Final Order No. 35277, Case No. PAC-E-21-07 (Rocky Mountain Power Idaho rate case)
Idaho Public Utilities CommissionTier 1 · Draft research, not yet verified · Open the source - 19Schedule 48, Large General Service 1,000 kW and Over, Delivery Service (P.U.C. OR No. 36)
PacifiCorp d/b/a Pacific PowerTier 1 · Draft research, not yet verified · Open the source - 20PUC Cuts PacifiCorp's Requested January 1 General Rate Increase (UE 433 decision release)
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 21Staff Opening Testimony (Staff/100), Docket UE 463
Staff of the Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 22Data Center Coalition Opening Testimony of Bieber, Docket UE 463
Data Center Coalition (filed in Public Utility Commission of Oregon Docket UE 463)Tier 1 · Draft research, not yet verified · Open the source - 23Staff Report, Portland General Electric Investigation into New Load Connection Costs, Docket UE 430 / Advice No. 24-38
Staff of the Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source - 24UTC Case Docket Detail Page, Docket UE-231037 (PacifiCorp, Advice 23-06)
Washington Utilities and Transportation CommissionTier 1 · Draft research, not yet verified · Open the source - 25PacifiCorp Advice 23-06 cover letter and Rule 14 tariff sheets, Docket UE-231037
PacifiCorp d/b/a Pacific Power & Light Company (filed with the Washington Utilities and Transportation Commission)Tier 1 · Draft research, not yet verified · Open the source - 26Order No. 23-472, PacifiCorp Revision of Rule 13 Line Extension Policy, Docket UE 424
Public Utility Commission of OregonTier 1 · Draft research, not yet verified · Open the source