Project File
Stream Data Centers DFW B Wilmer (Wilmer)
Wilmer,Dallas County,TexasOperatingFirst public 2026Last checked Nov 14, 2026
Stream Data CentersOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
6 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Stream Data Centers DFW B Wilmer (Wilmer) is an operating data center project in Wilmer, Dallas County, Texas. Stream Data Centers is named as operator. It was first public in 2026. It was announced at 90 MW.
Stream Data Centers DFW B Wilmer (Wilmer) is an operating data center project in Wilmer, Dallas County, Texas. Stream Data Centers is named as operator. It was announced at 90 MW. All six of the core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Wilmer, Dallas County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of Stream Data Centers DFW B Wilmer (Wilmer)Operating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas
The act covers customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has 90 MW announced on record, but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))
Rule checks: Project is in Texas; 90 MW on record (announced), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
- OperatorStream Data Centers
Public records
2 records found so far. 8 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Pending before the commission · Nov 5, 2026Joint Application of Comanche Peak Power Company LLC and Amazon Data Services, Inc. for Approval of a Net Metering Arrangement
- Utility commission · Decided · Apr 23, 2026Application of Crusoe Energy Systems LLC, FGE Goodnight I, LLC, and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement
Questions people ask
- Where is Stream Data Centers DFW B Wilmer (Wilmer)?
- Stream Data Centers DFW B Wilmer (Wilmer) is a data center project in Wilmer, Dallas County, Texas.
- Who operates Stream Data Centers DFW B Wilmer (Wilmer)?
- Stream Data Centers is named as the operator of Stream Data Centers DFW B Wilmer (Wilmer).
- How big is Stream Data Centers DFW B Wilmer (Wilmer)?
- Stream Data Centers DFW B Wilmer (Wilmer) was announced at 90 MW of capacity. The site covers 77 acres.
- What stage is Stream Data Centers DFW B Wilmer (Wilmer)?
- Stream Data Centers DFW B Wilmer (Wilmer) is operating. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1PUCT Interchange filing index, Project or Docket No. 58881
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 2PUCT Interchange filing index, Project or Docket No. 59399
Public Utility Commission of TexasTier 1 · Captured 2026-11-08 · Open the source - 3Stream Data Centers data center locations (operator’s own list)
Stream Data CentersTier 2 · Captured 2026-11-10 · Open the source - 4DFW B Wilmer Data Center | Stream Data Centers
Stream Data CentersTier 2 · Captured 2026-11-14 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page