Skip to content

Project File

Compass Datacenters Red Oak Campus (Red Oak; 360 MW)

Red Oak,Ellis County,TexasOperatingFirst public 2026Last checked Nov 14, 2026

Compass DatacentersOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

6 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Confirmed: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Compass Datacenters Red Oak Campus (Red Oak; 360 MW) is an operating data center project in Red Oak, Ellis County, Texas. Compass Datacenters is named as operator. It was first public in 2026. It was announced at 360 MW.

Compass Datacenters Red Oak Campus (Red Oak; 360 MW) is an operating data center project in Red Oak, Ellis County, Texas. Compass Datacenters is named as operator. It was announced at 360 MW. All six of the core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Red Oak, Ellis County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

360 MWAnnounced capacity
4Public records we have found
2Tax agreements on record

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Ellis County, Texas.See every project on the map

Timeline

  1. · New projectFirst public record of Compass Datacenters Red Oak Campus (Red Oak; 360 MW)Operating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The act covers customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has 360 MW announced on record, but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))

    Rule checks: Project is in Texas; 360 MW on record (announced), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

Public records

4 records found so far. 7 kinds of record are still being collected.

See every record

Questions people ask

Where is Compass Datacenters Red Oak Campus (Red Oak; 360 MW)?
Compass Datacenters Red Oak Campus (Red Oak; 360 MW) is a data center project in Red Oak, Ellis County, Texas.
Who operates Compass Datacenters Red Oak Campus (Red Oak; 360 MW)?
Compass Datacenters is named as the operator of Compass Datacenters Red Oak Campus (Red Oak; 360 MW).
How big is Compass Datacenters Red Oak Campus (Red Oak; 360 MW)?
Compass Datacenters Red Oak Campus (Red Oak; 360 MW) was announced at 360 MW of capacity.
What stage is Compass Datacenters Red Oak Campus (Red Oak; 360 MW)?
Compass Datacenters Red Oak Campus (Red Oak; 360 MW) is operating. It was first public in 2026.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Local Development Agreement Database (SB 1340), Chapter 380/381 agreements dataset
    Texas Comptroller of Public Accounts
    Tier 1 · Captured 2026-11-17 · Open the source
  2. 2
    PUCT Interchange filing index, Project or Docket No. 58881
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    PUCT Interchange filing index, Project or Docket No. 59399
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-08 · Open the source
  4. 4
    Compass Datacenters data center locations (operator’s own list)
    Compass Datacenters
    Tier 2 · Captured 2026-11-10 · Open the source
  5. 5
    Compass Red Oak, N. Austin Blvd Campus
    Compass Datacenters
    Tier 4 · Captured 2026-11-08 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page