Skip to content

Project File

Centersquare SEA3 (Seattle)

Lynnwood,Snohomish County,WashingtonOperatingFirst public 2026Last checked Nov 14, 2026

CentersquareOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Centersquare SEA3 (Seattle) is an operating data center project in Lynnwood, Snohomish County, Washington. Centersquare is named as operator. It was first public in 2026. It was announced at 17.3 MW.

Centersquare SEA3 (Seattle) is an operating data center project in Lynnwood, Snohomish County, Washington. Centersquare is named as operator. It was announced at 17.3 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Lynnwood, Snohomish County, Washington. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

17 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Centersquare SEA3 (Seattle) in Lynnwood, Snohomish County, Washington, captured 2017
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2017Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Snohomish County, Washington.See every project on the map

Timeline

  1. · New projectFirst public record of Centersquare SEA3 (Seattle)Operating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Washington SB 5982: Applies clean energy deadlines to large customers buying market power

    The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 17.3 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Washington SB 6231: Ends a tax break for replacement data center equipment

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 17.3 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

Bills and laws in Washington

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Centersquare SEA3 (Seattle)?
    Centersquare SEA3 (Seattle) is a data center project in Lynnwood, Snohomish County, Washington.
    Who operates Centersquare SEA3 (Seattle)?
    Centersquare is named as the operator of Centersquare SEA3 (Seattle).
    How big is Centersquare SEA3 (Seattle)?
    Centersquare SEA3 (Seattle) was announced at 17.3 MW of capacity.
    What stage is Centersquare SEA3 (Seattle)?
    Centersquare SEA3 (Seattle) is operating. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Centersquare data center locations (operator’s own list)
      Centersquare
      Tier 2 · Captured 2026-11-10 · Open the source
    2. 2
      Csquare Customer Services Guide, version 1.1.1
      Csquare (Phoenix Infrastructure LLC)
      Tier 4 · Captured 2026-11-08 · Open the source
    3. 3
      Lynnwood SEA3 Data Center | CenterSquare
      CenterSquare
      Tier 4 · Captured 2026-11-14 · Open the source
    4. 4
      2020 ZCTA to county relationship file (tab20_zcta520_county20_natl.txt)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-09 · Open the source
    5. 5
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page