WashingtonSenate2025-2026 Biennium, 2026 Regular SessionBill
SB 5982: Applies clean energy deadlines to large customers buying market power
Official title: Updating provisions for consumer-owned utilities, including port districts, and affected market customers under the clean energy transformation act
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
In effect as of Jun 11, 2026. The official record says: signed into law.
- Filed (done)
- In committee (done)
- Passed one chamber (done)
- Passed both chambers (done)
- Signed into law (done)
- In effect (current stage)
What it means for a household (draft rating)
Unclear for households. The bill updates provisions for consumer-owned utilities, and its text names no data center and sets no data center cost rule.
We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.
What it does
Definition
Applies to: affected market customers (Washington)
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.”
Sec. 1, amending RCW 19.405.020, SSB 5982 session law
Effective date
Applies to: affected market customers (Washington)
Starts: 2026-06-11.
“EFFECTIVE DATE: June 11, 2026…”
Certification of enrollment, SSB 5982 session law (Chapter 181, Laws of 2026)
Service terms
Applies to: affected market customers (Washington)
“For affected market customers, the commission must, on its own motion or if requested, enforce compliance with the requirements of this chapter.”
Sec. 3, new section in chapter 19.405 RCW, SSB 5982 session law
Reporting duty
Applies to: affected market customers (Washington)
“The commission must adopt rules establishing reporting requirements for affected market customers to demonstrate compliance with this chapter.”
Sec. 2, amending RCW 19.405.100, SSB 5982 session law
Who it touches (36)
Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Attalia Data Center Campus
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon West Richland Data Center Campus
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Big Rock Data Center Project
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 1,000 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is a customer of a utility, an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centeris SH1 Puyallup
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 50 MW on record (not stated), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centersquare SEA3 (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 17.3 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cogent Data Center Spokane
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne PNW1 Quincy
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 48 MW on record (generator capacity), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Quincy
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 36 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank SEA1 (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 0.21 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank SEA2 (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 3 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SEA10 (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty Seattle
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE2 (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE3 (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE4 (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE4 Kent
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Seattle Data Centers (SE2, SE3)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Quincy I
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 40 MW on record (not stated), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Seattle Data Center
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Columbia Data Center
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft East Wenatchee Data Center Campus
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft MWH Data Center
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 204 MW on record (generator capacity), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Malaga Data Center Campus
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 360 MW on record (grid connection), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT DATA Quincy Data Center
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 84 MW on record (generator capacity), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Data Centers SDC Columbia (East Wenatchee)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 70 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Data Centers SDC Quincy (Quincy)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 123 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Data Centers SDC Seattle (Seattle)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 54 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Intergate.Quincy
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 248.1 MW on record (generator capacity), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Intergate.Seattle
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 54 MW on record (not stated), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey SDC Columbia
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 70 MW on record (grid connection), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Serverfarm TiTAN Moses Lake
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 34 MW on record (not stated), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026TierPoint Spokane Data Centers (Liberty Lake)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has no capacity figure on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Unnamed Data Center Project (Avista 500 MW MOU)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 500 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Quincy Campus (Quincy)
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 89 MW announced on record, but whether this project is an affected market customer that obtains electricity as a market customer is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage WA1 Quincy Campus
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 89 MW on record (IT load), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Yahoo Quincy Data Center Campus
The act covers affected market customers, electricity consumers who become a market customer after May 7, 2019, who must meet the chapter's reporting and compliance requirements; this project has 97 MW on record (generator capacity), but whether this project is an affected market customer that obtains electricity as a market customer is not on record.
“An "affected market customer" is an electricity consumer who becomes a market customer after May 7, 2019.” (Sec. 1, amending RCW 19.405.020, SSB 5982 session law)
Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked
Who acted
- CosponsorLiiasSenate
- CosponsorNoblesSenate
- CosponsorShewmakeSenate
- Primary sponsorHuntSenate
Timeline
Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.
- · SenatePrefiled for introduction.Stage: Filed
- · SenateFirst reading, referred to Environment, Energy & Technology.Stage: In committee
- · SenatePublic hearing in the Senate Committee on Environment, Energy & Technology at 1:30 PM.
- · SenateExecutive session scheduled, but no action was taken in the Senate Committee on Environment, Energy & Technology at 10:30 AM.
- · SenateExecutive action taken in the Senate Committee on Environment, Energy & Technology at 10:30 AM. ENET - Majority; 1st substitute bill be substituted, do pass.
- · SenatePassed to Rules Committee for second reading.
- · SenatePlaced on second reading by Rules Committee.
- · Senate1st substitute bill substituted (ENET 26). Rules suspended. Placed on Third Reading. Third reading, passed; yeas, 30; nays, 19; absent, 0; excused, 0.Stage: Passed one chamber
- · HouseFirst reading, referred to Environment & Energy.
- · HousePublic hearing in the House Committee on Environment & Energy at 10:30 AM.
- · HouseExecutive action taken in the House Committee on Environment & Energy at 8:00 AM. ENVI - Majority; do pass with amendment(s).
- · HouseReferred to Rules 2 Review.
- · HouseRules Committee relieved of further consideration. Placed on second reading.
- · HouseCommittee amendment(s) adopted as amended. Rules suspended. Placed on Third Reading. Third reading, passed; yeas, 57; nays, 37; absent, 0; excused, 4.Stage: Passed both chambers
- · SenateSenate concurred in House amendments. Passed final passage; yeas, 30; nays, 19; absent, 0; excused, 0.
- · SenatePresident signed.
- · HouseSpeaker signed.
- Delivered to Governor.
- Governor signed. Chapter 181, 2026 Laws.Stage: Signed into law
- Effective date 6/11/2026.Stage: In effect
More from Washington
- SB 6231 · In effectEnds a tax break for replacement data center equipment
- HB 2515 · Died or failedSets tariff, reporting, and clean energy rules for large energy users
- SB 6171 · Died or failedSets tariff, reporting, and clean energy rules for large energy users
- HB 2708 · Died or failedRemoves the sales tax exemption for replacement data center equipment
- HB 2655 · Died or failedExempts new Spokane County data center construction from sales tax
Sources
- 1SB 5982 - 2025-26 - Clean Energy Transformation Act, consumer-owned utilities and affected market customers - Bill summary
Washington State LegislatureTier 1 · Open the source - 2Substitute Senate Bill 5982, Chapter 181, Laws of 2026 (session law)
Washington State LegislatureTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "SB 5982: Applies clean energy deadlines to large customers buying market power." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/wa-2025-26-sb-5982
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page