WashingtonSenate2025-2026 Biennium, 2026 Regular SessionBill

SB 6231: Ends a tax break for replacement data center equipment

Official title: Removing a tax exemption for the replacement of equipment for data centers (substitute title: Expiring tax exemptions for data centers)

Official text

Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.

Where it stands

In effect as of Jun 11, 2026. The official record says: signed into law.

  1. Filed (done)
  2. In committee (done)
  3. Passed one chamber (done)
  4. Passed both chambers (done)
  5. Signed into law (done)
  6. In effect (current stage)

What it means for a household (draft rating)

Helps households. The bill ends the sales and use tax exemption for data centers that qualify through refurbishment on July 1, 2026.

"The exemption granted to data centers that qualify through refurbishment under this subsection (1)(e) expires July 1, 2026."Sec. 2, RCW 82.08.986(1)(e)(iii), engrossed first substitute (ESSB 6231)

We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.

What it does

  • Tax exemption

    Applies to: new exemption certificates under RCW 82.08.9861 (urban data center program) (Washington)

    Starts: 2026-07-01. Ends: 2028-07-01.

    “No new exemption certificates may be issued on or after July 1, 2028.”

    Sec. 3, RCW 82.08.9861(1)(c)

  • Effective date

    Applies to: Sections 2 and 3 of the act (Washington)

    Starts: 2026-07-01.

    “Sections 2 and 3 of this act take effect July 1, 2026.”

    Sec. 4 (new section)

  • Tax exemption

    Applies to: data centers qualifying under RCW 82.08.986(8)(f)(i)(C)(III) (urban program, later qualification window) (Washington)

    Starts: 2026-07-01.

    “"eligible server equipment" means the original server equipment installed in a building within an eligible computer data center on or after July 1, 2015((, and replacement server equipment)).”

    Sec. 2, RCW 82.08.986(8)(h)(iii)

  • Sunset

    Applies to: the RCW 82.08.986 data center exemptions (Washington)

    Starts: 2026-07-01. Ends: 2048-07-01.

    “This section expires July 1, 2048.”

    Sec. 2, RCW 82.08.986(9)

  • Sunset

    Applies to: the RCW 82.08.9861 data center exemptions (Washington)

    Starts: 2026-07-01. Ends: 2038-07-01.

    “The exemptions provided in this section expire July 1, 2038.”

    Sec. 3, RCW 82.08.9861(1)(d)

Who it touches (36)

Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Attalia Data Center Campus

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon West Richland Data Center Campus

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Big Rock Data Center Project

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 1,000 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centeris SH1 Puyallup

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 50 MW on record (not stated), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centersquare SEA3 (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 17.3 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cogent Data Center Spokane

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne PNW1 Quincy

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 48 MW on record (generator capacity), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Quincy

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 36 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank SEA1 (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 0.21 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank SEA2 (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 3 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SEA10 (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty Seattle

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE2 (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE3 (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE4 (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SE4 Kent

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Seattle Data Centers (SE2, SE3)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Quincy I

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 40 MW on record (not stated), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Seattle Data Center

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Columbia Data Center

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft East Wenatchee Data Center Campus

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft MWH Data Center

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 204 MW on record (generator capacity), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Malaga Data Center Campus

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 360 MW on record (grid connection), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT DATA Quincy Data Center

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 84 MW on record (generator capacity), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Data Centers SDC Columbia (East Wenatchee)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 70 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Data Centers SDC Quincy (Quincy)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 123 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Data Centers SDC Seattle (Seattle)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 54 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Intergate.Quincy

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 248.1 MW on record (generator capacity), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Intergate.Seattle

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 54 MW on record (not stated), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey SDC Columbia

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 70 MW on record (grid connection), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Serverfarm TiTAN Moses Lake

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 34 MW on record (not stated), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026TierPoint Spokane Data Centers (Liberty Lake)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has no capacity figure on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Unnamed Data Center Project (Avista 500 MW MOU)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 500 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Quincy Campus (Quincy)

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 89 MW announced on record, but whether this project holds or seeks an exemption certificate under either program is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage WA1 Quincy Campus

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 89 MW on record (IT load), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Yahoo Quincy Data Center Campus

    The act covers the state data center exemption programs under RCW 82.08.986 and 82.08.9861, under which no new exemption certificates may be issued on or after July 1, 2028 and the exemptions later expire; this project has 97 MW on record (generator capacity), but whether this project holds or seeks an exemption certificate under either program is not on record.

    “No new exemption certificates may be issued on or after July 1, 2028.” (Sec. 3, RCW 82.08.9861(1)(c))

    Rule checks: Project is in Washington. Still to check: dates: not checked, who it covers: not checked

Who acted

Timeline

Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.

  1. · SenateFirst reading, referred to Ways & Means.Stage: Filed
  2. · SenatePublic hearing in the Senate Committee on Ways & MeansStage: In committee
  3. · SenateExecutive action taken in the Senate Committee on Ways & Means; majority report: 1st substitute bill be substituted, do pass
  4. · SenatePassed to Rules Committee for second reading.
  5. · SenatePlaced on second reading by Rules Committee.
  6. · SenateFloor amendment(s) adopted.
  7. · SenateRules suspended. Placed on Third Reading.
  8. · SenatePassed by the Senate (third reading, final passage)Stage: Passed one chamber
  9. · HouseFirst reading, referred to Finance.
  10. · HouseReferred to Rules 2 Review.
  11. · HouseRules suspended. Placed on Third Reading.
  12. · HousePassed by the HouseStage: Passed both chambers
  13. · SenatePresident signed.
  14. · HouseSpeaker signed.
  15. Delivered to Governor
  16. Governor signed.Stage: Signed into law
  17. Effective date 6/11/2026*Stage: In effect

More from Washington

Sources

  1. 1
    Senate Bill Report, SB 6231 (2026)
    Washington State Legislature (lawfilesext.leg.wa.gov)
    Tier 1 · Open the source
  2. 2
    Engrossed Substitute Senate Bill 6231 (2026), text as passed
    Washington State Legislature (lawfilesext.leg.wa.gov)
    Tier 1 · Open the source
  3. 3
    SB 6231 - Washington State Legislature (bill summary page, 2025-26)
    Washington State Legislature (app.leg.wa.gov)
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "SB 6231: Ends a tax break for replacement data center equipment." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/wa-2025-26-sb-6231

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page