Project File

Stream Wilmer II campus (DFWC)

Wilmer,Dallas County,TexasUnder constructionLast checked Nov 14, 2026

Stream Data CentersDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Electric utility
  • Still to confirm: Capacity
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Stream Wilmer II campus (DFWC) is a under-construction data center project in Wilmer, Dallas County, Texas. Stream Data Centers is named as operator. No site capacity figure is published for this project.

Stream Wilmer II campus (DFWC) is an under-construction data center project in Wilmer, Dallas County, Texas. Stream Data Centers is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Wilmer, Dallas County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

2Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Dallas County, Texas.See every project on the map

The land, to scale

One football field
140 acres, about 106 football fields. Drawn as a square for scale; the real shape is not known.

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The reliability service covers large load customers in the ERCOT power region with a demand of at least 75 megawatts, and bars customers that curtail in response to wholesale prices or take part in another reliability or ancillary service; this project has no capacity figure on record, and its demand and its participation in another reliability or ancillary service are not on record.

    “The commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated emergency condition.” (SECTION 4, Utilities Code Sec. 39.170(b))

    Rule checks: Project is in Texas. Still to check: size: unknown, who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

Public records

2 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is Stream Wilmer II campus (DFWC)?
Stream Wilmer II campus (DFWC) is a data center project in Wilmer, Dallas County, Texas.
Who operates Stream Wilmer II campus (DFWC)?
Stream Data Centers is named as the operator of Stream Wilmer II campus (DFWC).
How big is Stream Wilmer II campus (DFWC)?
The site covers 140 acres.
What stage is Stream Wilmer II campus (DFWC)?
Stream Wilmer II campus (DFWC) is under construction.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    PUCT Interchange filing index, Project or Docket No. 58881
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    PUCT Interchange filing index, Project or Docket No. 59399
    Public Utility Commission of Texas
    Tier 1 · Captured 2026-11-08 · Open the source
  3. 3
    Stream Data Centers Locations
    Stream Data Centers
    Tier 4 · Captured 2026-11-08 · Open the source
  4. 4
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page