Charlotte,Mecklenburg County,North CarolinaOperatingLast checked Nov 8, 2026

FlexentialOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Flexential Charlotte - North Data Center is an operating data center project in Charlotte, Mecklenburg County, North Carolina. Flexential is named as operator. It was announced at 3.3 MW.

Flexential Charlotte - North Data Center is an operating data center project in Charlotte, Mecklenburg County, North Carolina. Flexential is named as operator. It was announced at 3.3 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Charlotte, Mecklenburg County, North Carolina. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

3 MWAnnounced capacity
1Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Flexential Charlotte - North Data Center in Charlotte, Mecklenburg County, North Carolina, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Mecklenburg County, North Carolina.See every project on the map

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026North Carolina SB 257: Ends the sales tax exemption for electricity used in datacenters

    Section 44.4 repeals the sales and use tax exemption for electricity used in datacenters, effective July 7, 2026 for billing periods starting on or after that date, and this project is an operating data center in North Carolina on record, so every condition the text sets is met by a fact on record.

    “Section 44.4 repeals the sales and use tax exemption for electricity used in datacenters with all net proceeds intended to be retained by the State.” (SECTION 44.4, as described in Fiscal Note SFN257v7)

    Rule checks: Project is in North Carolina. Still to check: dates: not checked, who it covers: not checked

Bills and laws in North Carolina

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 3.3 MW · Operating facilityit_load

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is Flexential Charlotte - North Data Center?
Flexential Charlotte - North Data Center is a data center project in Charlotte, Mecklenburg County, North Carolina.
Who operates Flexential Charlotte - North Data Center?
Flexential is named as the operator of Flexential Charlotte - North Data Center.
How big is Flexential Charlotte - North Data Center?
Flexential Charlotte - North Data Center was announced at 3.3 MW of capacity.
What stage is Flexential Charlotte - North Data Center?
Flexential Charlotte - North Data Center is operating.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Data Centers Update: City Council business meeting October 12 2026
    City of Charlotte
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Charlotte - North data center
    Flexential
    Tier 4 · Captured 2026-11-08 · Open the source
  3. 3
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page