Skip to content

North CarolinaSenate2025-2026 General AssemblyBill

SB 730: Sets siting, water, and power contract rules for large data centers

Official title: AN ACT TO ESTABLISH REQUIREMENTS FOR SITING AND OPERATION OF DATA CENTERS AND TO MAKE VARIOUS CHANGES TO STATE ENERGY AND UTILITIES POLICY

Official text

Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.

Where it stands

Passed one chamber as of Jun 8, 2026. The official record says: Ref To Com On Rules and Operations of the Senate.

  1. Filed (done)
  2. In committee (done)
  3. Passed one chamber (current stage)
  4. Passed both chambers (not reached)
  5. Signed into law (not reached)
  6. In effect (not reached)

What it means for a household (draft rating)

Helps households. The act requires every data center electric service contract to carry minimum billing that recovers the utility's incremental costs of serving the data center.

"Minimum billing requirements designed to recover incremental costs associated with serving or preparing to serve a data center."Section 4, new G.S. 62-142.1(a)(1), Edition 5 text

We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.

What it does

  • Contract term

    Applies to: electric service contracts with data centers (North Carolina)

    “A contract term that is sufficient to recover all of the electric public utility's incremental costs and which may exceed the length of the applicable service tariff.”

    SECTION 4.(a), G.S. 62-142.1(a)(2)

  • Who pays for grid costs

    Applies to: electric service contracts between electric public utilities and data centers (North Carolina)

    “Each contract between an electric public utility and a data center for the provision of electric service shall include terms and conditions designed to (i) protect residential, other retail, and wholesale electricity customers from costs incurred or reasonably anticipated to be incurred by the electric public utility to provide electric service to the data center and (ii) prevent, to the maximum extent reasonably feasible, other retail customers from subsidizing the cost of the data center's electric service.”

    SECTION 4.(a), G.S. 62-142.1(a)

  • Definition · threshold 100 MW

    Applies to: data centers subject to Part I site assessment rules (North Carolina)

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.”

    SECTION 1.(a), G.S. 160D-974(d)

  • Incentive restriction

    Applies to: local governments siting data centers of 100 MW or more (North Carolina)

    “Notwithstanding subsection (a), (b), or (d) of this section, local governments are prohibited from providing any economic development incentives for siting of a data center within their jurisdiction.”

    SECTION 6.(a), G.S. 158-7.1(i)

  • Minimum payment

    Applies to: electric service contracts with data centers (North Carolina)

    “Minimum billing requirements designed to recover incremental costs associated with serving or preparing to serve a data center.”

    SECTION 4.(a), G.S. 62-142.1(a)(1)

  • Preemption

    Applies to: condemnors acquiring land for a data center (North Carolina)

    “Notwithstanding any authority granted under this Chapter, no condemnor shall exercise the power of eminent domain for the purpose of acquiring land for a data center to be sited upon.”

    SECTION 5, G.S. 40A-14

  • Reporting duty

    Applies to: electric public utilities serving data centers (North Carolina)

    “As part of the report required on the long-range needs for the expansion of facilities for the generation of electricity pursuant to G.S. 62-110.1(c), the electric public utility shall include details on contracted demand versus actual demand for each data center for the previous three years.”

    SECTION 4.(a), G.S. 62-142.1(c)

  • Site assessment

    Applies to: new data centers seeking local approval (North Carolina)

    “Prior to any approval of a rezoning application, special exception, conditional or special use permit, or building permit for the siting of a new data center, a local government shall require that an applicant: (1) Perform and submit a site assessment to examine the sound profile of the data center on residential units and schools located within 500 feet of the data center property boundary.”

    SECTION 1.(a), G.S. 160D-974(a)

Who it touches (15)

Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Richmond County AI Campus

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Apple Maiden Data Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Lee County

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record. Status part: the bill's status (Ref To Com On Rules and Operations of the Senate) means its text is not yet operative law, and the text part below is read from the bill as passed one chamber. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty CLT10 (Uptown Charlotte)

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty Charlotte Campus (Moores Chapel Road)

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has 400 MW on record (IT load), but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina; 400 MW on record (it load), threshold 100 MW (SECTION 1.(a), G.S. 160D-974(d)). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Energy Storage Solutions Kingsboro Megasite Data Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Energy Storage Solutions Tarboro Data Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has 300 MW on record (not stated), but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina; 300 MW on record (not stated), threshold 100 MW (SECTION 1.(a), G.S. 160D-974(d)). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Lenoir Data Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026ImpactData Dream Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has 300 MW on record (not stated), but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina; 300 MW on record (not stated), threshold 100 MW (SECTION 1.(a), G.S. 160D-974(d)). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Meta Forest City Data Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Conover Data Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Hickory Data Center (Hickory Lincolnton Highway)

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Hickory Data Center (Tate Boulevard)

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Maiden Data Center

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has no capacity figure on record, but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026PowerHouse Charlotte

    The act covers data centers with a peak monthly electricity demand of 100 megawatts or greater, including new data centers that must submit a site assessment before local approval; this project has 500 MW on record (grid connection), but the project's peak monthly electricity demand and whether it is a new data center seeking local approval is not on record.

    “For purposes of this section, the term "data center" means a facility, campus of facilities, or array of interconnected facilities used by an entity or other business enterprise for the primary purpose of storing, retrieving, managing, and processing digital data, which has a peak monthly electricity demand of 100 megawatts or greater.” (SECTION 1.(a), G.S. 160D-974(d))

    Rule checks: Project is in North Carolina; 500 MW on record (grid connection), threshold 100 MW (SECTION 1.(a), G.S. 160D-974(d)). Still to check: who it covers: not checked

Other projects we track in North Carolina (6), not affected

Who acted

  • Primary sponsorSenator JarvisSenate

Timeline

Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.

  1. · SenateFiled as Expand CEPS/Nuclear and Hydro; referred to Rules and Operations of the SenateStage: Filed
  2. · SenatePassed Senate (Second Edition engrossed 5/7/25)Stage: Passed one chamber
  3. · HousePassed House (Fifth Edition engrossed 6/3/26)
  4. · SenateRef To Com On Rules and Operations of the Senate

More from North Carolina

Sources

  1. 1
    SB 730 (Edition 5), Ratepayer Protection Act
    North Carolina General Assembly
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "SB 730: Sets siting, water, and power contract rules for large data centers." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/nc-2025-26-sb-730

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page