Skip to content

Project File

CyrusOne DUR1 / DUR2 (Durham)

North CarolinaOperatingFirst public 2026Last checked Nov 14, 2026

CyrusOneOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

3 of 6 details confirmed

  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: County
  • Still to confirm: City or address
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

CyrusOne DUR1 / DUR2 (Durham) is an operating data center project in North Carolina. CyrusOne is named as operator. It was first public in 2026. It was announced at 40 MW.

CyrusOne DUR1 / DUR2 (Durham) is an operating data center project in North Carolina. CyrusOne is named as operator. It was announced at 40 MW. 3 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in North Carolina. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

40 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline

  1. · New projectFirst public record of CyrusOne DUR1 / DUR2 (Durham)Operating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026North Carolina SB 257: Ends the sales tax exemption for electricity used in datacenters

    Section 44.4 repeals the sales and use tax exemption for electricity used in datacenters, effective July 7, 2026 for billing periods starting on or after that date, and this project is an operating data center in North Carolina on record, so every condition the text sets is met by a fact on record. Status part: the act's status (Session Law 2026-41, in effect July 7, 2026) makes the repeal operative. Text part: the decision rests on the repeal text quoted here, which reaches electricity used in datacenters.

    “Section 44.4 repeals the sales and use tax exemption for electricity used in datacenters with all net proceeds intended to be retained by the State.” (SECTION 44.4, as described in Fiscal Note SFN257v7)

    Rule checks: Project is in North Carolina. Still to check: dates: not checked, who it covers: not checked

Bills and laws in North Carolina

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is CyrusOne DUR1 / DUR2 (Durham)?
    CyrusOne DUR1 / DUR2 (Durham) is a data center project in North Carolina.
    Who operates CyrusOne DUR1 / DUR2 (Durham)?
    CyrusOne is named as the operator of CyrusOne DUR1 / DUR2 (Durham).
    How big is CyrusOne DUR1 / DUR2 (Durham)?
    CyrusOne DUR1 / DUR2 (Durham) was announced at 40 MW of capacity.
    What stage is CyrusOne DUR1 / DUR2 (Durham)?
    CyrusOne DUR1 / DUR2 (Durham) is operating. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      CyrusOne data center locations (operator’s own list)
      CyrusOne
      Tier 2 · Captured 2026-11-10 · Open the source
    2. 2
      Durham, NC: DUR1-DUR2 | CyrusOne
      CyrusOne
      Tier 4 · Captured 2026-11-14 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page