Data centers in Bluffdale, Utah
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 8 data center projects in Bluffdale, Utah as of November 2026: 6 operating, 1 proposed and 1 expanding, totaling about 46 MW announced where a figure is published.
Bluffdale has 8 tracked data centers. Their announced capacity totals about 46 MW where a figure is published. Of those, 6 operating, 1 proposed and 1 expanding. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Bluffdale
- DataBank Granite Point Campus
ExpandingBluffdale
- DataBank SLC2 (Salt Lake City)
OperatingBluffdale3 MW announced
- DataBank SLC3 (Salt Lake City)
OperatingBluffdale7 MW announced
- DataBank SLC4 (Salt Lake City)
OperatingBluffdale4 MW announced
- DataBank SLC5 (Salt Lake City)
OperatingBluffdale10 MW announced
- DataBank SLC6 (Salt Lake City)
OperatingBluffdale22 MW announced
- Edged Energy Bluffdale
ProposedBluffdale
- NSA Utah Data Center
OperatingBluffdale
Who serves this place
- Not collected yet.
More places in Salt Lake County
Bluffdale is part of Salt Lake County.
Nearby places
- West Jordan7 data center projects tracked
- Salt Lake City4 data center projects tracked
- West Valley City3 data center projects tracked
- Millcreek1 data center project tracked
- South Jordan1 data center project tracked
Court cases and commission dockets in Utah (4)
Bills and laws in Utah
- HB 76 · In effect · May 6, 2026Requires data centers to report water use before and after building
- HB 507 · Signed into law · Mar 25, 2026Limits local incentives for large data centers outside development zones
- SB 132 · In effect · May 7, 2025Sets cost and service rules for electric loads over 100 megawatts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Bluffdale?
- Data Center Fact Check tracks 8 data center projects in Bluffdale as of November 2026. Of those, 6 operating, 1 proposed and 1 expanding.
- What is the biggest data center in Bluffdale?
- By announced capacity, the biggest data center in Bluffdale is DataBank SLC6 (Salt Lake City), announced at 22 MW. It is operating.
- How much power do data centers in Bluffdale use?
- The 8 projects tracked in Bluffdale have announced about 46 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Bluffdale." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ut-bluffdale
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page