Skip to content

Project File

Fontus Data Centre Project

ColoradoAnnouncedFirst public 2025Filing entity: Westbridge Renewable Energy Corp.Last checked Nov 13, 2026

Westbridge Renewable EnergyDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

3 of 6 details confirmed

  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: County
  • Still to confirm: City or address
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Fontus Data Centre Project is an announced data center project in Colorado. Westbridge Renewable Energy is named as developer. It was first public in 2025. It was announced at 380 MW.

Fontus Data Centre Project is an announced data center project in Colorado. Westbridge Renewable Energy is named as developer. It was announced at 380 MW. 3 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Colorado. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

380 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline

  1. · New projectFirst public record of Fontus Data Centre ProjectAnnounced

Bills and laws in Colorado

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 380 MW · what the figure measures is not stated

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Fontus Data Centre Project?
    Fontus Data Centre Project is a data center project in Colorado.
    Who is developing Fontus Data Centre Project?
    Westbridge Renewable Energy is named as the developer of Fontus Data Centre Project.
    How big is Fontus Data Centre Project?
    Fontus Data Centre Project was announced at 380 MW of capacity.
    What stage is Fontus Data Centre Project?
    Fontus Data Centre Project is announced. It was first public in 2025.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Westbridge Renewable Energy Announces Launch of First Data Centre Project: Fontus, a 380+ MW Strategic Hub in Colorado
      Westbridge Renewable Energy Corp. (company release republished by North American Clean Energy)
      Tier 4 · Captured 2026-11-08 · Open the source
    2. 2
      Westbridge Renewable Energy corporate presentation, September 2026
      Westbridge Renewable Energy
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page