Project File
Equinix NY13 (New York metro)
Elmsford,Westchester County,New YorkOperatingFirst public 2026Last checked Nov 13, 2026
EquinixOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Equinix NY13 (New York metro) is an operating data center project in Elmsford, Westchester County, New York. Equinix is named as operator. It was first public in 2026. No site capacity figure is published for this project.
Equinix NY13 (New York metro) is an operating data center project in Elmsford, Westchester County, New York. Equinix is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Elmsford, Westchester County, New York. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline
- · New projectFirst public record of Equinix NY13 (New York metro)Operating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026New York EO 62: Pauses state permits for large data centers pending new standards
The act covers data centers that consume or can consume 50 megawatts of energy or more, whose applications for Department of Environmental Conservation permits for construction or expansion were not determined complete before July 14, 2026; this project has no capacity figure on record, but the project's energy consumption and its permit application status before the Department of Environmental Conservation and its completeness date is not on record. Status part: the bill's status (in effect) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“oftentimes on a continuous twenty-four-hour cycle, and (3) consume or can consume 50 megawatts of energy or more” (Executive Order No. 62, section "Data Center Permitting Moratorium and Generic Environmental Impact Statement (GEIS)" (definition))
Rule checks: Project is in New York. Still to check: size: unknown, dates: not checked, who it covers: not checked
Bills and laws in New York
- EO 62 · In effect · Jul 14, 2026Pauses state permits for large data centers pending new standards
- A11560 · Passed both chambers · Jun 4, 2026Would pause large data center permits and set rate classes
- A9086 · In committee · Jun 1, 2026Regulates data center energy use and requires disclosure reports
- S9182 · In committee · May 22, 2026Bars power allocations and caps state aid for data centers
- S9144A · In committee · May 12, 2026Would pause data center permits until state rules are finished
- S9288 · In committee · Feb 25, 2026Repeals sales tax exemptions for data center equipment
Who's involved
- OperatorEquinix
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Equinix NY13 (New York metro)?
- Equinix NY13 (New York metro) is a data center project in Elmsford, Westchester County, New York.
- Who operates Equinix NY13 (New York metro)?
- Equinix is named as the operator of Equinix NY13 (New York metro).
- What stage is Equinix NY13 (New York metro)?
- Equinix NY13 (New York metro) is operating. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Equinix data center locations (operator’s own list)
EquinixTier 2 · Captured 2026-11-10 · Open the source - 2
- 3Equinix NY11 IBX Technical Specifications
Equinix, Inc.Tier 2 · Captured 2026-11-13 · Open the source - 4U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page