OneNeck Denver Data Center

Englewood,Douglas County,ColoradoOperatingFirst public 2014Last checked Nov 10, 2026

OneNeckOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

OneNeck Denver Data Center is an operating data center project in Englewood, Douglas County, Colorado. OneNeck is named as operator. It was first public in 2014. No site capacity figure is published for this project.

OneNeck Denver Data Center is an operating data center project in Englewood, Douglas County, Colorado. OneNeck is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Englewood, Douglas County, Colorado. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of OneNeck Denver Data Center in Englewood, Douglas County, Colorado, captured 2019
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2019Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Douglas County, Colorado.See every project on the map

Timeline

  1. · New projectFirst public record of OneNeck Denver Data CenterOperating

Bills and laws in Colorado

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is OneNeck Denver Data Center?
    OneNeck Denver Data Center is a data center project in Englewood, Douglas County, Colorado.
    Who operates OneNeck Denver Data Center?
    OneNeck is named as the operator of OneNeck Denver Data Center.
    What stage is OneNeck Denver Data Center?
    OneNeck Denver Data Center is operating. It was first public in 2014.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      OneNeck IT Solutions prepares to break ground on Tier 3 data center in Denver metro area
      OneNeck IT Solutions (company release via PRWeb)
      Tier 4 · Captured 2026-11-10 · Open the source
    2. 2
      Cogent service locations, Denver metro
      Cogent Communications
      Tier 4 · Captured 2026-11-10 · Open the source