Skip to content

Project File

Digital Realty Trumbull

Trumbull,Greater Bridgeport Planning Region,ConnecticutOperatingFirst public 2009Filing entity: Digital Realty Trust, Inc.Last checked Nov 8, 2026

Digital RealtyOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Digital Realty Trumbull is an operating data center project in Trumbull, Greater Bridgeport Planning Region, Connecticut. Digital Realty is named as operator. It was first public in 2009. No site capacity figure is published for this project.

Digital Realty Trumbull is an operating data center project in Trumbull, Greater Bridgeport Planning Region, Connecticut. Digital Realty is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Trumbull, Greater Bridgeport Planning Region, Connecticut. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Digital Realty Trumbull in Trumbull, Greater Bridgeport Planning Region, Connecticut, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)

Timeline

  1. · New projectFirst public record of Digital Realty TrumbullOperating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Connecticut HB 6514: Creates the data center tax incentive program (CGS 32-286), Public Act 21-1

    The act covers qualified data centers with an agreement with the Commissioner of the Department of Economic and Community Development, which must make a qualified investment of at least $200 million on or before the fifth anniversary of construction first commencing (outside an enterprise or opportunity zone, for a term of not more than 20 years); this project has no capacity figure on record, but the project's qualified investment, its zone status, and whether it holds a Department agreement under the program is not on record. Status part: the bill's status (enacted) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “NE Edge shall make, on or before the fifth anniversary of the date in which construction, rehabilitation, renovation or repair of a Qualified Data Center first commences, a Qualified Investment of at least Two Hundred Million Dollars ($200,000,000); provided, however, if the agreement entered into between NE Edge and the DECD Commissioner has a term of greater than twenty (20) years, such Qualified Investment shall be at least Four Hundred Million Dollars ($400,000,000) with a term of thirty (30) years” (Town of Bozrah host agreement, section 1.B(b), restating the Legislation requirements)

    Rule checks: Project is in Connecticut. Still to check: who it covers: not checked

Bills and laws in Connecticut

All 7 in Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Digital Realty Trumbull?
    Digital Realty Trumbull is a data center project in Trumbull, Greater Bridgeport Planning Region, Connecticut.
    Who operates Digital Realty Trumbull?
    Digital Realty is named as the operator of Digital Realty Trumbull.
    What stage is Digital Realty Trumbull?
    Digital Realty Trumbull is operating. It was first public in 2009.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Digital Realty Trust, Inc. Form 8-K (New England Portfolio purchase agreements)
      U.S. Securities and Exchange Commission (EDGAR)
      Tier 2 · Captured 2026-11-08 · Open the source
    2. 2
      Digital Realty Trust Completes Acquisition of Major Datacenter Portfolio in New England
      Digital Realty Trust, Inc. (PR Newswire release)
      Tier 4 · Captured 2026-11-08 · Open the source
    3. 3
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page