ConnecticutHouse2025 SessionBill
HB 5955: PURA proceeding to evaluate large data centers impact on distribution reliability
Official title: AN ACT REQUIRING AN IMPACT EVALUATION CONCERNING LARGE DATA CENTERS.
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
Died or failed as of Jan 22, 2025. The official record says: died in committee.
- Filed (done)
- In committee (not reached)
- Passed one chamber (not reached)
- Passed both chambers (not reached)
- Signed into law (not reached)
- In effect (not reached)
- Died or failed (current stage)
What it does
Study or report
Applies to: Public Utilities Regulatory Authority (Connecticut)
“To require that the Public Utilities Regulatory Authority, in consultation with the Office of Consumer Counsel, the Department of Energy and Environmental Protection and the regional independent system operator, initiate an uncontested proceeding to evaluate the impact of large data centers on electric distribution system reliability…”
Proposed Bill No. 5955 (LCO 3471), operative paragraph
Who it touches
No project we track is matched to this bill or order: its rules do not reach them, or a check found it does not apply.
Other projects we track in Connecticut (6), not affected
- Cigna Windsor Data CenterOperating
- CyrusOne NorwalkOperating
- Digital Realty TrumbullOperating
- NE Edge at MillstoneProposed
- NE Edge KillinglyProposed
- TierPoint WaterburyOperating
Who acted
- Primary sponsorAundre BumgardnerHouse, district 41
More from Connecticut
- HB 5469 · Died or failedPURA licensing for colocated (behind-the-meter) suppliers serving loads of 50 MW or more
- SB 245 · Died or failedEnds tax incentives for new data centers
- SB 1292 · Died or failedQuarterly energy and water reporting and efficiency standards for AI data centers (as introduced); study (as substituted)
- HB 5926 · Died or failedSurcharge on data center electricity, proceeds to the residential Combined Public Benefits Charge
- HB 6514 · Signed into lawCreates the data center tax incentive program (CGS 32-286), Public Act 21-1
Sources
- 1HB 5955 (2025), proposed bill text, LCO No. 3471
Connecticut General AssemblyTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "HB 5955: PURA proceeding to evaluate large data centers impact on distribution reliability." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/ct-2025-hb-5955
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page