Project File

Digi Power X North Tonawanda

North Tonawanda,Niagara County,New YorkOperatingFiling entity: Digi Power X Inc.Last checked Nov 8, 2026

Digi Power XOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Digi Power X North Tonawanda is an operating data center project in North Tonawanda, Niagara County, New York. Digi Power X is named as operator. It was announced at 60 MW.

Digi Power X North Tonawanda is an operating data center project in North Tonawanda, Niagara County, New York. Digi Power X is named as operator. It was announced at 60 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in North Tonawanda, Niagara County, New York. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

60 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Digi Power X North Tonawanda in North Tonawanda, Niagara County, New York, captured 2019
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2019Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Niagara County, New York.See every project on the map

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026New York EO 62: Pauses state permits for large data centers pending new standards

    The act covers data centers that consume or can consume 50 megawatts of energy or more, whose applications for Department of Environmental Conservation permits for construction or expansion were not determined complete before July 14, 2026; this project has 60 MW on record (generator capacity), but the project's permit application status before the Department of Environmental Conservation and its completeness date is not on record.

    “oftentimes on a continuous twenty-four-hour cycle, and (3) consume or can consume 50 megawatts of energy or more” (Executive Order No. 62, section "Data Center Permitting Moratorium and Generic Environmental Impact Statement (GEIS)" (definition))

    Rule checks: Project is in New York; 60 MW on record (announced), threshold 50 MW (Executive Order No. 62, section "Data Center Permitting Moratorium and Generic Environmental Impact Statement (GEIS)" (definition)). Still to check: dates: not checked, who it covers: not checked

Bills and laws in New York

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 60 MW · On-site power plant (as acquired)Jan 2023 · generator_capacity

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Digi Power X North Tonawanda?
    Digi Power X North Tonawanda is a data center project in North Tonawanda, Niagara County, New York.
    Who operates Digi Power X North Tonawanda?
    Digi Power X is named as the operator of Digi Power X North Tonawanda.
    How big is Digi Power X North Tonawanda?
    Digi Power X North Tonawanda was announced at 60 MW of capacity.
    What stage is Digi Power X North Tonawanda?
    Digi Power X North Tonawanda is operating.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      City's data center moratorium in New York impacts Digi Power X's hopes to convert cryptomine to AI data center
      Data Center Dynamics
      Tier 3 · Captured 2026-11-08 · Open the source
    2. 2
      Digihost Provides Update on Power Plant Acquisition
      Digihost Technology Inc.
      Tier 4 · Captured 2026-11-08 · Open the source
    3. 3
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source