Project File
DC BLOX Birmingham Data Center
Birmingham,Jefferson County,AlabamaOperatingFirst public 2019Last checked Nov 8, 2026
DC BLOXDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
DC BLOX Birmingham Data Center is an operating data center project in Birmingham, Jefferson County, Alabama. DC BLOX is named as operator. It was first public in 2019. It was announced at 5 MW.
DC BLOX Birmingham Data Center is an operating data center project in Birmingham, Jefferson County, Alabama. DC BLOX is named as operator. It was announced at 5 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Birmingham, Jefferson County, Alabama. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of DC BLOX Birmingham Data CenterOperating
Bills and laws in Alabama
- SB 270 · Signed into law · Apr 17, 2026Requires data center power contracts to repay their own costs
- SB 265 · Died or failed · Apr 9, 2026Senate companion to HB 399 on data center tax abatements (not enacted)
- HB 399 · Signed into law · Apr 9, 2026Limits data center tax abatements to 20 years, with a community-investment path to 30, and extends the program sunset to 2032
- HB 403 · Died or failed · Mar 31, 2026House companion to SB 270 on PSC review of data center power contracts (not enacted)
Who's involved
- Developer and operatorDC BLOX
Power
Capacity, as announced or filed
- 60 MW · Full build-out (planned)Jul 2019 · it_load
- 5 MW · Phase 1Jul 2019 · what the figure measures is not stated
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is DC BLOX Birmingham Data Center?
- DC BLOX Birmingham Data Center is a data center project in Birmingham, Jefferson County, Alabama.
- Who operates DC BLOX Birmingham Data Center?
- DC BLOX is named as the operator of DC BLOX Birmingham Data Center.
- How big is DC BLOX Birmingham Data Center?
- DC BLOX Birmingham Data Center was announced at 5 MW of capacity. The site covers 27 acres.
- What stage is DC BLOX Birmingham Data Center?
- DC BLOX Birmingham Data Center is operating. It was first public in 2019.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1
- 2DC BLOX Expands Birmingham Data Center to Empower High-Performance Computing
DC BLOXTier 4 · Captured 2026-11-08 · Open the source