How many data centers in Loudoun County?

128 tracked data center projects in Loudoun County, 93 operating. Why the county building count reads 245, and what each published count measures.

By Bear Harper · Published November 29, 2026

Loudoun County holds 128 data center projects in this site's record, counted on November 28, 2026: 93 operating, and 35 in the pipeline or carrying no stage in the record. The county publishes a higher number because it counts buildings. This record counts projects: one row per site or campus, however many buildings the site holds. Fifty-eight of the 128 projects carry an Ashburn place key and 38 carry a Sterling place key, 96 of the county's 128 projects between them. Fifteen of the 128 publish an announced capacity, totaling 1,180.9 MW. The other 113 publish none, so the capacity figure is a floor and no county total exists. In fiscal 2024, the computer equipment inside these projects paid $684,787,341 in county tax at the full general rate, and the county counts data centers as 38 percent of its general fund revenue.

Loudoun County, Virginia, holds 128 data center projects in this site's record, 93 of them operating, counted on November 28, 2026. That is the direct answer, and it needs one definition to mean anything. This record counts projects, one row per site or campus. The county counts buildings. Operators count campuses and markets. Published totals for the same county differ because each source counts a different unit, and this page shows the 128, its parts, and the other counts with their units named.

The count: 128 projects, by stage

This site counts a project as one site or campus, however many buildings the campus holds. The 128 Loudoun projects by stage, counted from the staged record on November 28, 2026:

StageProjects
Operating93
Under construction1
Expanding2
In permitting1
Proposed5
Stage not established in the record26
Total128

Source: this site's staged record, projects.csv, rows with county key us-va-loudoun.

The operating row carries the count. Ninety-three of the 128 projects already run. The pipeline behind them is thin on paper: one project under construction, two expanding, one in permitting, and five proposed. The soft spot is the last row. Twenty-six projects carry a county key and no stage statement in any staged document, so the table prints them as their own row and assigns them to no stage.

Loudoun's 128 are 55 percent of Virginia's 231 tracked projects, inside a dataset of 1,320 projects. No other county in the record holds half as many. Santa Clara County in California, the next largest, holds 58. The full list, project by project, sits on Loudoun County's page on this site. The cluster hub, Loudoun County data centers: the complete record, tells the county's whole record as a narrative, and the data study, Loudoun County by the numbers, prints the same record as tables that later pieces cite.

Why other counts run higher: three units, three totals

Ask how many data centers Loudoun County holds and the answer depends on the unit the source counts. Three units produce the three totals in circulation.

Projects. This record's unit is the project: one site or campus, one row. A campus with three buildings adds one to this count. A campus with one building also adds one. The unit follows the public record behind each site, because permits, tax lines, and county cases attach to sites and campuses. Counted this way, Loudoun holds 128.

Buildings. The county counts buildings. Its Data Center Dashboard, published on the county's own site, tabulates the industry by number of buildings: 245 buildings built or under construction as of September 1, 2026, with 114 more approved and awaiting a building permit and 54 more in the legislative process. The county's own summary page prints the same 245 as its headline figure. A campus with three buildings adds three to the county's count. That single difference in unit explains most of the gap between this record's 128 projects and the county's 245 buildings, and neither total is an error. Each one answers its own question. This site read the county's dashboard figures in the county's published materials in November 2026. They are the county's published counts, stated here with their unit and their date, and they are not part of this site's staged record.

Buildings, mapped by an independent tracker. The counting gap shows up inside a single source as well. An independent building tracker that ranks for this query maps 231 data center buildings in the county, checked October 31, 2026 on its page. The same tracker also counts sites with plans in review, a project-style unit, and keeps the two counts apart on its own page. Two units, one source, two totals.

Campuses and markets. Operators count their own footprints, and their unit cuts in both directions. Google's Loudoun presence is one program in the county announcement behind it and two rows in this record: the Google Arcola Center and the Stonewall Business Park campus each carry a row, because Stonewall holds its own parcel-level records and this record's rule is one row per site. The same record holds separate rows for QTS Ashburn, QTS Ashburn 2, QTS Ashburn 3, and QTS Ashburn-Moran, each a distinct site with its own record, plus four stub rows drawn from the operator's own location list that may duplicate those sites and sit in the count flagged as unsettled. An operator presenting its Northern Virginia presence as one market entry would group rows this record keeps apart, and an operator naming each facility would split rows this record joins. Operator totals therefore land above or below 128 depending on how each company draws its own map.

Where the 128 sit: Ashburn and Sterling hold 96

The record's place keys place most of the county's projects in two communities in its east. The 128 by place key, recomputed from the staged record on November 28, 2026:

Place key in the recordProjects
Ashburn58
Sterling38
Leesburg4
Arcola1
Aldie1
Chantilly1
Stone Ridge1
No place key in the record24
Total128

Source: this site's staged record, projects.csv, city place keys on the rows with county key us-va-loudoun.

Ashburn and Sterling together hold 96 of the 128 projects, three of every four in the county. Ashburn's 58 alone match the entire project count of Santa Clara County, the record's second largest county. The concentration is the fact behind the Data Center Alley name, stated here only as far as the record's place structure supports it: the projects cluster in the county's east, under two place names.

Names and place keys can part ways. QTS Ashburn, one of the 93 operating projects and the county's best documented single campus on this site, carries a Sterling place key in the record, because Sterling is where the campus sits. The 24 rows with no place key carry a county key and no city statement in any staged document. This page assigns them to no place, and the Ashburn and Sterling shares above count only the rows the record places.

One campus inside the count: QTS Ashburn, operating in Sterling at an announced 32 MW. The video below walks the site from the air and through the public record behind it.

QTS Ashburn video · 2 min 18 sec

Full project file: QTS Ashburn mega data center

The size behind the count: a floor of 1,180.9 MW

A count of projects says nothing about size, and the record's size figure comes with a limit printed on it. Fifteen of the 128 projects publish an announced capacity. Those 15 total 1,180.9 MW: 855.9 MW across 12 operating projects, 181 MW across the 2 expanding projects, and 144 MW at the one project under construction. The other 113 projects publish no announced capacity, including 81 of the 93 operating projects, so 1,180.9 MW is a floor. No county capacity total exists in the record, and this page prints none.

One nearby measure is a different quantity. Virginia air permits state the size of each campus's backup generator fleet, and 85 of the 96 Loudoun rows in this site's capacity file measure those fleets. Generator fleet megawatts describe backup equipment a permit authorizes. This site never adds them to announced capacity. The data study prints the full capacity table, project by project.

What this record cannot count

The 128 is a count of tracked projects, and three quantities a reader might expect from a count sit outside the record entirely.

  • Buildings per site. The record's rows carry no building count, so no total building figure can be built from them. The county's building total exists only in the county's own published materials, stated above with its unit and date.
  • Suites and tenants. One row stands for one site or campus regardless of how many tenants lease space inside it. A building shared by five tenants adds one to this count, and the record holds no tenant count for any row.
  • Retired sites. No Loudoun row in the record carries a retired or closed stage. A site that closed before this record began leaves no row, and a site that closes after November 28, 2026 leaves the count when the record documents the closure.

The stage gap belongs on the same list. Twenty-six of the 128 rows carry no stage in any staged document. They are counted in the total because the record ties each one to the county, and they are assigned to no stage because no document states one.

Why the number carries weight

The count is the base under the county's largest revenue line. In fiscal 2024, the computer equipment inside these projects paid $684,787,341 in county personal property tax, at the county's general rate of $4.15 per $100 of assessed value. The county counts data centers as 38 percent of its general fund revenue and 47 percent of its total property tax revenue, in a chart published with the fiscal 2026 proposed budget that states no year. A full search of this site's agreements record found no Loudoun County abatement and no payment-in-lieu deal for data centers, so the 128 projects pay at the full rate as far as the record shows.

The same concentration cuts the other way. A county drawing 38 percent of its general fund from one industry holds its budget on that industry's building pace and hardware values. Whether the count is this record's 128 projects or the county's 245 buildings, the fiscal fact underneath is one industry, in one county, carrying just under half of its property tax revenue.

The rest of the Loudoun record

This piece is the fourth in the Loudoun County cluster. The hub published first and the data study second, and this page links back to both. The remaining pieces publish one at a time, each after approval:

1. How much tax revenue do data centers pay Loudoun County? 2. Loudoun County's data center tax rates, explained 3. Why Loudoun kept cutting its real property tax rate 4. How Ashburn became Data Center Alley 5. Loudoun County's data center rules: zoning and approvals 6. Loudoun vs Prince William: two counties, two approaches 7. How much power do Loudoun County data centers use? 8. How much water do Loudoun County data centers use? 9. Who pays for the grid upgrades Loudoun data centers need? 10. Data center jobs in Loudoun County: what the record shows

How this count is built

Every project row in this count comes from a public document: a county case, a state permit, a utility filing, or the operator's own published record, staged in this site's dataset with its source attached. The count and its stage and place breakdowns were computed from that staged record on November 28, 2026, and the build is saved with the cluster's data prep file. A project enters the count when a public document ties it to Loudoun County, and it leaves only if the record behind it fails. Data Center Fact Check is published by Perspective Holdings, LLC. Corrections go to the editor and are noted on the page when a figure changes.

Frequently asked questions

How many data centers are in Loudoun County?

This site's record holds 128 data center projects in Loudoun County, counted on November 28, 2026: 93 operating, 1 under construction, 2 expanding, 1 in permitting, and 5 proposed. The remaining 26 carry no stage in the record and are printed as stage not established. The count treats one site or campus as one project, however many buildings the campus holds. The county counts buildings, so county-published counts run higher than this one.

Why do other sources give a different number of data centers in Loudoun County?

Each source counts a different unit. This record counts projects, one row per site or campus, and reaches 128. The county counts buildings, and its published dashboard put the built and under construction total at 245 buildings as of September 1, 2026. An independent building tracker maps 231 buildings in the county. An operator counts its own campuses and markets, a unit that can group several of this record's projects under one name or split one project into several named facilities.

How many data centers are in Ashburn?

Fifty-eight of the 128 Loudoun County projects in this record carry an Ashburn place key, the largest single place share in the county. Thirty-eight carry a Sterling place key, so Ashburn and Sterling together hold 96 of the 128 projects. Twenty-four projects carry a county key and no place key in the record, and this site assigns them to no place.

How many of Loudoun County's data centers are operating?

Ninety-three of the 128 projects are operating. One project is under construction, 2 are expanding, 1 is in permitting, and 5 are proposed. The remaining 26 carry no stage in any staged document, so the count prints them as stage not established instead of assigning them a stage the record does not state.

QTS Ashburn video · 2 min 18 sec

Full project file: QTS Ashburn mega data center

Sources

  1. FY 2026 Proposed Budget · Loudoun County, Virginia · Checked November 28, 2026 · General Fund revenue chapter: the data center computer equipment line (fiscal 2024 actual $684,787,341); tax rate table (the general personal property rate of $4.15 per $100 that data center computer equipment pays). The equipment line is personal property tax on data center computer equipment only and excludes real property tax on buildings and land.
  2. FY 2026 Proposed Budget Presentation · Loudoun County, Virginia · Checked November 28, 2026 · Data centers provide 38 percent of General Fund revenues; data center personal property (33 percent) plus real property (14 percent) make 47 percent of total property tax revenue. The presentation states no year for the shares.
  3. Data Center Dashboard · Loudoun County, Virginia · Checked November 28, 2026 · The county's own published dashboard (not a staged source). Its Numbers at a Glance table counts buildings: 245 built or under construction, 114 approved but not yet issued a building permit, and 54 in the legislative process, as of September 1, 2026. The figures are the county's published building counts, stated in the article with their unit and date.
  4. Data Centers in Loudoun County · Loudoun County, Virginia · Checked November 28, 2026 · The county's own summary page (not a staged source). Its By the Numbers panel prints 245 data centers, the building count from the same county table.
  5. Loudoun County (Ashburn) Data Centers: Map of 231 Buildings · CamSahead · Checked November 28, 2026 · Independent building tracker (not a staged source). The page maps 231 data center buildings in the county, checked October 31, 2026 on the page, and separately counts sites with plans in review.
  6. Staged record: projects.csv (1,320 projects, 128 with county us-va-loudoun, 231 in Virginia; place keys on the Loudoun rows recomputed November 28, 2026), project_capacity.csv (96 Loudoun rows over 80 projects), county_metrics.csv, and abatements.csv (218 agreements in 39 states, no Loudoun County row) · Data Center Fact Check · Checked November 28, 2026

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "How many data centers in Loudoun County?." Published 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/articles/how-many-data-centers-in-loudoun-county