Skip to content

Project File

Vantage Data Centers San Antonio Campus (San Antonio)

San Antonio,Bexar County,TexasOperatingFirst public 2026Last checked Nov 14, 2026

Vantage Data CentersOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Vantage Data Centers San Antonio Campus (San Antonio) is an operating data center project in San Antonio, Bexar County, Texas. Vantage Data Centers is named as operator. It was first public in 2026. No site capacity figure is published for this project.

Vantage Data Centers San Antonio Campus (San Antonio) is an operating data center project in San Antonio, Bexar County, Texas. Vantage Data Centers is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in San Antonio, Bexar County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Bexar County, Texas.See every project on the map

Timeline

  1. · New projectFirst public record of Vantage Data Centers San Antonio Campus (San Antonio)Operating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas

    The act covers customers requesting a new or expanded interconnection in the ERCOT power region where the total load at a single site would exceed a demand threshold of 75 megawatts; this project has no capacity figure on record, but whether this project is requesting a new or expanded interconnection and what the total load at its single site would be is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “The standards must apply only to customers requesting a new or expanded interconnection where the total load at a single site would exceed a demand threshold established by the commission based on the size of loads that significantly impact transmission needs in the ERCOT power region. The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).” (SECTION 2, Utilities Code Sec. 37.0561(c))

    Rule checks: Project is in Texas. Still to check: size: unknown, who it covers: not checked

Bills and laws in Texas

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Vantage Data Centers San Antonio Campus (San Antonio)?
    Vantage Data Centers San Antonio Campus (San Antonio) is a data center project in San Antonio, Bexar County, Texas.
    Who operates Vantage Data Centers San Antonio Campus (San Antonio)?
    Vantage Data Centers is named as the operator of Vantage Data Centers San Antonio Campus (San Antonio).
    What stage is Vantage Data Centers San Antonio Campus (San Antonio)?
    Vantage Data Centers San Antonio Campus (San Antonio) is operating. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Vantage Data Centers data center locations (operator’s own list)
      Vantage Data Centers
      Tier 2 · Captured 2026-11-10 · Open the source
    2. 2
      TDLR TABS Project Details: Data Center Building TX11 (TABS2024007561)
      Texas Department of Licensing and Regulation
      Tier 1 · Captured 2026-11-14 · Open the source
    3. 3
      TDLR TABS Project Details: Vantage Data Center (TX12) (TABS2026001234)
      Texas Department of Licensing and Regulation
      Tier 1 · Captured 2026-11-14 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page