Project File
STACK Infrastructure POR02 (Portland)
Portland,Multnomah County,OregonOperatingFirst public 2026Last checked Nov 11, 2026
STACK InfrastructureOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
STACK Infrastructure POR02 (Portland) is an operating data center project in Portland, Multnomah County, Oregon. STACK Infrastructure is named as operator. It was first public in 2026. No site capacity figure is published for this project.
STACK Infrastructure POR02 (Portland) is an operating data center project in Portland, Multnomah County, Oregon. STACK Infrastructure is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Portland, Multnomah County, Oregon. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of STACK Infrastructure POR02 (Portland)Operating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oregon HB 3546: Creates a separate rate class for large energy use facilities
The act covers large energy use facilities, facilities that use or are able to use 20 megawatts or more and are primarily engaged in providing a service described under code 518210 of the 2022 North American Industry Classification System, as retail electricity consumers; this project has no capacity figure on record, but whether this project is primarily engaged in a service described under NAICS code 518210 and is a retail electricity consumer of an electric company is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Large energy use facility” means a facility that uses or is able to use 20 megawatts or more and is primarily engaged in providing a service described under code 518210 of the 2022 North American Industry Classification System.” (SECTION 2(1)(d))
Rule checks: Project is in Oregon. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oregon HB 4084: Pauses enterprise zone tax breaks for data center projects
The act covers eligible business firms seeking enterprise zone authorization under ORS 285C.140 for property consisting of a data center project, which the act bars from authorization until 90 days after the 2027 regular session adjourns, and data center property, whose enterprise zone exemption period the act bars from extension; this project has no capacity figure on record, but whether this project has sought or holds an enterprise zone authorization or extension agreement for data center property is not on record. Status part: the bill's status (enacted) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
“Notwithstanding any other provision of law, an eligible business firm may not be authorized under ORS 285C.140 with respect to property consisting of a data center project before the date that is 90 days following the date on which the 2027 regular session of the Legislative Assembly adjourns sine die.” (Enrolled HB 4084, Section 11b)
Rule checks: Project is in Oregon. Still to check: who it covers: not checked
Bills and laws in Oregon
- HB 4084 · Signed into law · Jun 5, 2026Pauses enterprise zone tax breaks for data center projects
- HB 3698 · Died or failed · Jun 27, 2025Requires data centers to report water and electricity use quarterly
- SB 553 · Died or failed · Jun 27, 2025Requires a state study of data center power usage
- HB 3546 · Signed into law · Jun 16, 2025Creates a separate rate class for large energy use facilities
Who's involved
- OperatorSTACK Infrastructure
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is STACK Infrastructure POR02 (Portland)?
- STACK Infrastructure POR02 (Portland) is a data center project in Portland, Multnomah County, Oregon.
- Who operates STACK Infrastructure POR02 (Portland)?
- STACK Infrastructure is named as the operator of STACK Infrastructure POR02 (Portland).
- What stage is STACK Infrastructure POR02 (Portland)?
- STACK Infrastructure POR02 (Portland) is operating. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1STACK Infrastructure data center locations (operator’s own list)
STACK InfrastructureTier 2 · Captured 2026-11-10 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page