Project File
DataBank DFW6 (Dallas)
Dallas,Dallas County,TexasOperatingFirst public 2026Last checked Nov 14, 2026
DataBankOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
DataBank DFW6 (Dallas) is an operating data center project in Dallas, Dallas County, Texas. DataBank is named as operator. It was first public in 2026. It was announced at 0.68 MW.
DataBank DFW6 (Dallas) is an operating data center project in Dallas, Dallas County, Texas. DataBank is named as operator. It was announced at 0.68 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Dallas, Dallas County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline
- · New projectFirst public record of DataBank DFW6 (Dallas)Operating
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
- OperatorDataBank
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is DataBank DFW6 (Dallas)?
- DataBank DFW6 (Dallas) is a data center project in Dallas, Dallas County, Texas.
- Who operates DataBank DFW6 (Dallas)?
- DataBank is named as the operator of DataBank DFW6 (Dallas).
- How big is DataBank DFW6 (Dallas)?
- DataBank DFW6 (Dallas) was announced at 0.68 MW of capacity.
- What stage is DataBank DFW6 (Dallas)?
- DataBank DFW6 (Dallas) is operating. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1DataBank data center locations (operator’s own list)
DataBankTier 2 · Captured 2026-11-10 · Open the source · Archived copy - 2
- 3U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page