Aligned Data Centers DFW-02 (Plano)

Plano,Collin County,TexasOperatingFirst public 2026Last checked Nov 14, 2026

Aligned Data CentersOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Aligned Data Centers DFW-02 (Plano) is an operating data center project in Plano, Collin County, Texas. Aligned Data Centers is named as operator. It was first public in 2026. It was announced at 36 MW.

Aligned Data Centers DFW-02 (Plano) is an operating data center project in Plano, Collin County, Texas. Aligned Data Centers is named as operator. It was announced at 36 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Plano, Collin County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

36 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Aligned Data Centers DFW-02 (Plano) in Plano, Collin County, Texas, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Collin County, Texas.See every project on the map

The land, to scale

One football field
19 acres, about 14 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Aligned Data Centers DFW-02 (Plano)Operating

Bills and laws in Texas

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Aligned Data Centers DFW-02 (Plano)?
    Aligned Data Centers DFW-02 (Plano) is a data center project in Plano, Collin County, Texas.
    Who operates Aligned Data Centers DFW-02 (Plano)?
    Aligned Data Centers is named as the operator of Aligned Data Centers DFW-02 (Plano).
    How big is Aligned Data Centers DFW-02 (Plano)?
    Aligned Data Centers DFW-02 (Plano) was announced at 36 MW of capacity. The site covers 19 acres.
    What stage is Aligned Data Centers DFW-02 (Plano)?
    Aligned Data Centers DFW-02 (Plano) is operating. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Aligned Data Centers data center locations (operator’s own list)
      Aligned Data Centers
      Tier 2 · Captured 2026-11-10 · Open the source
    2. 2
      Aligned to Expand Dallas-Fort Worth Metro Area Campus with Second Hyperscale Data Center
      Aligned Data Centers
      Tier 4 · Captured 2026-11-14 · Open the source
    3. 3
      Aligned Data Centers Opens Ultra-Efficient Data Center in Plano
      Aligned Data Centers
      Tier 4 · Captured 2026-11-08 · Open the source
    4. 4
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page