STRATACACHE Waterloo data center and network operations center

Waterloo,Black Hawk County,IowaOperatingFirst public 2020Filing entity: STRATACACHE, Inc.Last checked Nov 8, 2026

STRATACACHEOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

STRATACACHE Waterloo data center and network operations center is an operating data center project in Waterloo, Black Hawk County, Iowa. STRATACACHE is named as operator. It was first public in 2020. No site capacity figure is published for this project.

STRATACACHE Waterloo data center and network operations center is an operating data center project in Waterloo, Black Hawk County, Iowa. STRATACACHE is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Waterloo, Black Hawk County, Iowa. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Black Hawk County, Iowa.See every project on the map

The land, to scale

One football field
17 acres, about 13 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of STRATACACHE Waterloo data center and network operations centerOperating

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iowa HF 976: Caps data center tax exemptions at 10 or 15 years

    The act covers data center businesses whose backup power generation fuel is exempt only for the first ten years of operation of new construction completed, or additions made, on or after the effective date of the act, in a city with a population of more than thirty thousand; this project has no capacity figure on record, but the project's construction or addition completion date and the population of its city is not on record.

    “For backup power generation fuel purchased by a data center business in connection with real property with new construction upon the property completed on or after the effective date of this division of this Act, or additions upon existing property on or after the effective date of this division of this Act, and such property is located entirely or in part within a city having a population of more than thirty thousand, according to the most recent decennial federal census, the first ten years of operation in connection with the new construction or addition upon the existing property.” (Division XII, section 73, amending section 423.3, subsection 95, paragraph a, subparagraph (2) (b) (ii))

    Rule checks: Project is in Iowa. Still to check: who it covers: not checked

Bills and laws in Iowa

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is STRATACACHE Waterloo data center and network operations center?
    STRATACACHE Waterloo data center and network operations center is a data center project in Waterloo, Black Hawk County, Iowa.
    Who operates STRATACACHE Waterloo data center and network operations center?
    STRATACACHE is named as the operator of STRATACACHE Waterloo data center and network operations center.
    How big is STRATACACHE Waterloo data center and network operations center?
    The site covers 17 acres.
    What stage is STRATACACHE Waterloo data center and network operations center?
    STRATACACHE Waterloo data center and network operations center is operating. It was first public in 2020.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      STRATACACHE announces acquisition of new network operations and hosting facility (Waterloo, Iowa)
      STRATACACHE
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page