Butte-Silver Bow (balance),Silver Bow County,MontanaCancelledFirst public 2024Filing entity: Horizons Montana LLCLast checked Nov 8, 2026
Sabey Data CentersDeveloperNorthWestern EnergyElectric utility
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Sabey Butte Data Center Campus is a cancelled data center project in Butte-Silver Bow (balance), Silver Bow County, Montana. Sabey Data Centers is named as developer. It was first public in 2024. It was announced at 250 MW.
Sabey Butte Data Center Campus is a cancelled data center project in Butte-Silver Bow (balance), Silver Bow County, Montana. Sabey Data Centers is named as developer. It was announced at 250 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Butte-Silver Bow (balance), Silver Bow County, Montana. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of Sabey Butte Data Center CampusCancelled
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Montana HB 424: Extends low property tax class for data centers and power plants
The act covers qualified data centers, facilities under single ownership on contiguous parcels that meet the act's building area and total cost floors, at least 300,000 square feet and $150 million, or 25,000 square feet of new or expanded area and $50 million invested in a 48-month period, with construction commencing after the stated dates; this project has 250 MW on record (not stated), but the project's building area, total cost, and ownership structure is not on record.
“"Qualified data center" means the land, improvements, and personal property of a facility designed or modified to house networked computers or equipment supporting computing, networking, or data storage” (MCA 15-6-162(2)(a), as amended by the bill's authorized print version)
Rule checks: Project is in Montana. Still to check: dates: not checked, who it covers: not checked
Bills and laws in Montana
- HB 877 · Died or failed · May 20, 2025Bars the utility commission from blocking service to large customers
- HB 424 · In effect · May 13, 2025Extends low property tax class for data centers and power plants
Who's involved
- DeveloperSabey Data Centers
- Electric utilityNorthWestern Energy
Power
Capacity, as announced or filed
- 50 MW · Initial loadJul 2025 · what the figure measures is not stated
- 250 MW · GrowthJul 2025 · what the figure measures is not stated
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Sabey Butte Data Center Campus?
- Sabey Butte Data Center Campus is a data center project in Butte-Silver Bow (balance), Silver Bow County, Montana.
- Who is developing Sabey Butte Data Center Campus?
- Sabey Data Centers is named as the developer of Sabey Butte Data Center Campus.
- How big is Sabey Butte Data Center Campus?
- Sabey Butte Data Center Campus was announced at 250 MW of capacity. The site covers 606 acres.
- What stage is Sabey Butte Data Center Campus?
- Sabey Butte Data Center Campus is cancelled. It was first public in 2024.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1SDC Montana project site (Environmental Stewardship and Quick Reference)
Sabey Data CentersTier 4 · Captured 2026-11-08 · Open the source - 2NorthWestern Energy Reports 2025 Financial Results (Form 8-K Exhibit 99.1)
NorthWestern Energy Group, Inc.Tier 1 · Captured 2026-11-08 · Open the source - 3Sabey backs out of proposal to build data center in Butte, Montana
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source - 4Motion Challenging Protective Order 8040, Montana PSC Docket No. 2022.09.087
Montana Public Service Commission (motion filed in the docket)Tier 1 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page