Big Horn Data Hub (MARA Hardin)

Hardin,Big Horn County,MontanaCancelledFirst public 2020Last checked Nov 8, 2026

Beowulf EnergyElectric utilityMARAOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Big Horn Data Hub (MARA Hardin) is a cancelled data center project in Hardin, Big Horn County, Montana. MARA is named as operator. It was first public in 2020. No site capacity figure is published for this project.

Big Horn Data Hub (MARA Hardin) is a cancelled data center project in Hardin, Big Horn County, Montana. MARA is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Hardin, Big Horn County, Montana. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Big Horn County, Montana.See every project on the map

The land, to scale

One football field
20 acres, about 15 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Big Horn Data Hub (MARA Hardin)Cancelled

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Montana HB 424: Extends low property tax class for data centers and power plants

    The act covers qualified data centers, facilities under single ownership on contiguous parcels that meet the act's building area and total cost floors, at least 300,000 square feet and $150 million, or 25,000 square feet of new or expanded area and $50 million invested in a 48-month period, with construction commencing after the stated dates; this project has no capacity figure on record, but the project's building area, total cost, and ownership structure is not on record.

    “"Qualified data center" means the land, improvements, and personal property of a facility designed or modified to house networked computers or equipment supporting computing, networking, or data storage” (MCA 15-6-162(2)(a), as amended by the bill's authorized print version)

    Rule checks: Project is in Montana. Still to check: dates: not checked, who it covers: not checked

Bills and laws in Montana

Open Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Big Horn Data Hub (MARA Hardin)?
    Big Horn Data Hub (MARA Hardin) is a data center project in Hardin, Big Horn County, Montana.
    Who operates Big Horn Data Hub (MARA Hardin)?
    MARA is named as the operator of Big Horn Data Hub (MARA Hardin).
    How big is Big Horn Data Hub (MARA Hardin)?
    The site covers 20 acres.
    What stage is Big Horn Data Hub (MARA Hardin)?
    Big Horn Data Hub (MARA Hardin) is cancelled. It was first public in 2020.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Marathon Patent Group Announces Joint Venture with Beowulf Energy for 105-Megawatt Bitcoin Mining Data Center
      Marathon Patent Group, Inc. (now MARA Holdings) via GlobeNewswire
      Tier 4 · Captured 2026-11-08 · Open the source