Skip to content

Project File

300 Jones Road data center (Spartanburg)

Spartanburg,Spartanburg County,South CarolinaProposedFirst public 2026Filing entity: 300 Jones Road Associates LLCLast checked Nov 8, 2026

300 Jones Road AssociatesDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

300 Jones Road data center (Spartanburg) is a proposed data center project in Spartanburg, Spartanburg County, South Carolina. 300 Jones Road Associates is named as developer. It was first public in 2026. It was announced at 65 MW.

300 Jones Road data center (Spartanburg) is a proposed data center project in Spartanburg, Spartanburg County, South Carolina. 300 Jones Road Associates is named as developer. It was announced at 65 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Spartanburg, Spartanburg County, South Carolina. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

65 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of 300 Jones Road data center (Spartanburg) (300 Jones Road Associates) in Spartanburg, Spartanburg County, South Carolina, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Spartanburg County, South Carolina.See every project on the map

The land, to scale

One football field
137 acres, about 104 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of 300 Jones Road data center (Spartanburg)Proposed

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026South Carolina H 5122: Bars large data centers from new provider sales tax exemption

    The act covers data centers with a peak demand of fifty megawatts or greater that become a customer of an electric service provider after December 31, 2026, which may not claim or use the provider sales tax exemption; this project has 65 MW announced on record, but the project's peak demand and the date it became a customer of an electric service provider is not on record.

    “For purposes of this subsection, "data center" means a facility, campus of facilities, or array of electronically interconnected facilities under a single electric supply agreement in this State used by an entity or other business enterprise to operate, manage, or maintain a computer, group of computers, or other organized assembly of hardware and software for the primary purpose of storing, retrieving, or transmitting data, other than facilities owned or operated by a telecommunications company as defined in Section 58-9-2200 or facilities that primarily support telecommunications service or network operations, that has a peak demand of fifty megawatts or greater, and that becomes a customer of an electric service provider after December 31, 2026.” (SECTION 1, Section 58-9-3100(C)(1))

    Rule checks: Project is in South Carolina; 65 MW on record (announced), threshold 50 MW (SECTION 1, Section 58-9-3100(C)(1)). Still to check: dates: not checked, who it covers: not checked

Bills and laws in South Carolina

All 7 in Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is 300 Jones Road data center (Spartanburg)?
    300 Jones Road data center (Spartanburg) is a data center project in Spartanburg, Spartanburg County, South Carolina.
    Who is developing 300 Jones Road data center (Spartanburg)?
    300 Jones Road Associates is named as the developer of 300 Jones Road data center (Spartanburg).
    How big is 300 Jones Road data center (Spartanburg)?
    300 Jones Road data center (Spartanburg) was announced at 65 MW of capacity. The site covers 137 acres.
    What stage is 300 Jones Road data center (Spartanburg)?
    300 Jones Road data center (Spartanburg) is proposed. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Spartanburg OKs three data center deals at election day meeting
      South Carolina Public Radio (WSSB)
      Tier 3 · Captured 2026-11-08 · Open the source
    2. 2
      NorthMark data center deal passes first county vote
      SpartanburgNow
      Tier 3 · Captured 2026-11-08 · Open the source
    3. 3
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page