Proposed data center at the former Hynix plant (Eugene)

Eugene,Lane County,OregonCancelledFirst public 2026Last checked Nov 8, 2026

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: First public date
  • Still to confirm: Capacity
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Proposed data center at the former Hynix plant (Eugene) is a cancelled data center project in Eugene, Lane County, Oregon. It was first public in 2026. No site capacity figure is published for this project.

Proposed data center at the former Hynix plant (Eugene) is a cancelled data center project in Eugene, Lane County, Oregon. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Eugene, Lane County, Oregon. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Site-level positionPin placed from the position we have on file, inside Lane County, Oregon.See every project on the map

The land, to scale

One football field
200 acres, about 151 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Proposed data center at the former Hynix plant (Eugene)Cancelled

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oregon HB 3546: Creates a separate rate class for large energy use facilities

    The act covers large energy use facilities, facilities that use or are able to use 20 megawatts or more and are primarily engaged in providing a service described under code 518210 of the 2022 North American Industry Classification System, as retail electricity consumers; this project has no capacity figure on record, but whether this project is primarily engaged in a service described under NAICS code 518210 and is a retail electricity consumer of an electric company is not on record.

    ““Large energy use facility” means a facility that uses or is able to use 20 megawatts or more and is primarily engaged in providing a service described under code 518210 of the 2022 North American Industry Classification System.” (SECTION 2(1)(d))

    Rule checks: Project is in Oregon. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oregon HB 4084: Pauses enterprise zone tax breaks for data center projects

    The act covers eligible business firms seeking enterprise zone authorization under ORS 285C.140 for property consisting of a data center project, which the act bars from authorization until 90 days after the 2027 regular session adjourns, and data center property, whose enterprise zone exemption period the act bars from extension; this project has no capacity figure on record, but whether this project has sought or holds an enterprise zone authorization or extension agreement for data center property is not on record. Status part: the bill's status (enacted) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “Notwithstanding any other provision of law, an eligible business firm may not be authorized under ORS 285C.140 with respect to property consisting of a data center project before the date that is 90 days following the date on which the 2027 regular session of the Legislative Assembly adjourns sine die.” (Enrolled HB 4084, Section 11b)

    Rule checks: Project is in Oregon. Still to check: who it covers: not checked

Bills and laws in Oregon

Open Bill Watch

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Proposed data center at the former Hynix plant (Eugene)?
    Proposed data center at the former Hynix plant (Eugene) is a data center project in Eugene, Lane County, Oregon.
    How big is Proposed data center at the former Hynix plant (Eugene)?
    The site covers 200 acres.
    What stage is Proposed data center at the former Hynix plant (Eugene)?
    Proposed data center at the former Hynix plant (Eugene) is cancelled. It was first public in 2026.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      FAQs: Understanding City review of allowed uses of the property at 1830 Willow Creek (former Hyundai/Hynix site)
      City of Eugene, Oregon
      Tier 1 · Captured 2026-11-08 · Open the source
    2. 2
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page