Equinix Secaucus Expansion (275 Hartz Way)

Secaucus,Hudson County,New JerseyApprovedFiling entity: Equinix, Inc.Last checked Nov 8, 2026

EquinixDeveloper

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Equinix Secaucus Expansion (275 Hartz Way) is an approved data center project in Secaucus, Hudson County, New Jersey. Equinix is named as developer. It was announced at 50 MW.

Equinix Secaucus Expansion (275 Hartz Way) is an approved data center project in Secaucus, Hudson County, New Jersey. Equinix is named as developer. It was announced at 50 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Secaucus, Hudson County, New Jersey. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

50 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Equinix Secaucus Expansion (275 Hartz Way) in Secaucus, Hudson County, New Jersey, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Aerial view of Equinix Secaucus Expansion (275 Hartz Way) in Secaucus, Hudson County, New Jersey, captured 2025
Aerial image, New Jersey 2025 orthophotography (NJOGIS), New Jersey Conditions of Use, Section F: State information is public domain unless a restriction is stated (none is stated for this imagery); copying and distribution allowed, acknowledgement requested, captured 2025Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: New Jersey 2025 orthophotography (NJOGIS)License: New Jersey Conditions of Use, Section F: State information is public domain unless a restriction is stated (none is stated for this imagery); copying and distribution allowed, acknowledgement requested
Site-level positionPin placed from the position we have on file, inside Hudson County, New Jersey.See every project on the map

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026New Jersey S3379: Requires twice yearly water and energy reports from data centers

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026New Jersey S3432: Creates tax credits for AI and data center investment

    The act covers AI data centers, facilities built to handle the computational needs of artificial intelligence applications such as machine learning training and deep learning, under the Next New Jersey Program; this project has 50 MW announced on record, but whether this project is an AI data center and whether it participates in the Next New Jersey Program is not on record.

    “AI data center means a facility specifically to handle the demanding computational needs of artificial intelligence applications, designed for tasks like machine learning training, deep learning algorithms, and complex data analysis, whose services are the storage, management, and processing of digital data” (S 3432 introduced text, section 2)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026New Jersey S4390: Ends uncommitted tax credits for data center projects

    The act covers tax credits awarded under the Next New Jersey Program, for which no more than $250 million may be made available; this project has 50 MW announced on record, but whether this project holds or seeks a tax credit under the Next New Jersey Program is not on record.

    “for tax credits awarded under the "Next New Jersey Program Act," P.L.2024, c.49 (C.34:1B-394 et al.); an amount not to exceed [$500,000,000] $250,000,000 shall be made available” (S 4390 introduced text, section 1.b.(1)(k) (bracketed figure is the prior law omitted by the act))

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

Bills and laws in New Jersey

All 8 in Bill Watch

Who's involved

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Equinix Secaucus Expansion (275 Hartz Way)?
    Equinix Secaucus Expansion (275 Hartz Way) is a data center project in Secaucus, Hudson County, New Jersey.
    Who is developing Equinix Secaucus Expansion (275 Hartz Way)?
    Equinix is named as the developer of Equinix Secaucus Expansion (275 Hartz Way).
    How big is Equinix Secaucus Expansion (275 Hartz Way)?
    Equinix Secaucus Expansion (275 Hartz Way) was announced at 50 MW of capacity.
    What stage is Equinix Secaucus Expansion (275 Hartz Way)?
    Equinix Secaucus Expansion (275 Hartz Way) is approved.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Secaucus Admits It Never Reviewed Plans for 125 MW Data Center Expansion, Secured No Community Benefits
      IDC Nova
      Tier 3 · Captured 2026-11-08 · Open the source
    2. 2
      U.S. Census Geocoder (batch geographies endpoint)
      U.S. Census Bureau
      Tier 1 · Captured 2026-11-11 · Open the source
    3. 3
      EIA Form 861, Service Territory file, 2025 (final)
      U.S. Energy Information Administration
      Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page