Skip to content

New JerseySenate2026-2027 Legislative SessionBill

S3379: Requires twice yearly water and energy reports from data centers

Official title: Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU

Official text

Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.

Where it stands

Signed into law as of Aug 27, 2026. The official record says: signed into law.

  1. Filed (done)
  2. In committee (done)
  3. Passed one chamber (done)
  4. Passed both chambers (done)
  5. Signed into law (current stage)
  6. In effect (not reached)

What it means for a household (draft rating)

Unclear for households. The law makes data center owners send water and energy use reports to the Board of Public Utilities twice a year.

"the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities"Sec. 1.b (introduced text)

We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.

What it does

  • Sunset

    Applies to: the reporting requirement

    “The reporting requirement established pursuant to subsection b. of this section shall be in effect for a period of three years following the effective date of this act.”

    S 3379 introduced text, section 1.f

  • Disclosure

    Applies to: data centers receiving a State financial incentive

    “if a data center is a recipient of a financial incentive from any State agency, then the data center shall also include in the water and energy usage report required pursuant to subsection b. of this section, the following information: (a) performance calculations and indicators for the data center, including the energy reuse factor, power usage effectiveness, renewable energy factor, and water usage effectiveness…”

    S 3379 introduced text, section 1.c.(1)

  • Reporting duty

    Applies to: data centers in New Jersey

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities…”

    S 3379 introduced text, section 1.b

Who it touches (35)

Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Centersquare EWR2 (New York/New Jersey)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Centersquare EWR3 (New York/New Jersey)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Centersquare EWR5 (New York/New Jersey)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Cologix NNJ2 and NNJ4 (Cedar Knolls)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Cologix NNJ3 (Parsippany)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026CoreSite Secaucus Campus (NY2 and NY3)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026CyrusOne NYM2 (Totowa)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026CyrusOne Somerset

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank EWR1 (New Jersey)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank EWR1 Newark

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank EWR2 (New Jersey)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank EWR2 Piscataway

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataOne Vineland

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Digital Realty Clifton Campus (EWR20)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Digital Realty EWR11 (Piscataway)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Digital Realty EWR12 (Piscataway)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Digital Realty EWR21 (Clifton)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY1 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY11 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY11 Carteret

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY2 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY3 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY4 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY5 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY6 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix NY7 (New York metro)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix Secaucus Campus (NY2, NY3, NY4, NY5, NY6)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Iron Mountain NJE-1

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026NYSE Mahwah Data Center

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026QTS East Windsor

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026QTS Piscataway 1

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Rackspace NYC1 (Somerset)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite NY4 (215 County Avenue)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Secaucus Expansion (275 Hartz Way)

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sentinel PN-DC1 South Brunswick

    The act requires the owner or operator of a data center in this state to prepare and submit a water and energy usage report to the Board of Public Utilities, and this project is a data center in New Jersey on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law) makes its text operative. Text part: the decision rests on the bill's text quoted here, which covers every data center in the State.

    “No later than six months after the effective date of this section, or, for a data center that has been in operation for at least one year as of the effective date of this section, no later than three months after the effective date of this section, and on a semi-annual basis thereafter, the owner or operator of a data center in the State shall prepare and submit a water and energy usage report to the Board of Public Utilities” (S 3379 introduced text, section 1.b)

    Rule checks: Project is in New Jersey. Still to check: who it covers: not checked

Who acted

Timeline

Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.

  1. · SenateIntroduced in the SenateStage: Filed
  2. · SenatePassed Senate (39-Y 0-N) after Assembly amendmentsStage: Passed both chambers
  3. · GovernorSigned by Governor - P.L. 2026, c. 75Stage: Signed into law

More from New Jersey

Sources

  1. 1
    S 3379 (2026), introduced text
    New Jersey Legislature (pub.njleg.state.nj.us)
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "S3379: Requires twice yearly water and energy reports from data centers." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/nj-2026-s3379

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page