Edged Project Gateway
Prichard,Mobile County,AlabamaProposedLast checked Nov 10, 2026
EdgedDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Still to confirm: Electric utility
- Still to confirm: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Edged Project Gateway is a proposed data center project in Prichard, Mobile County, Alabama. Edged is named as operator. It was announced at 8 MW.
Edged Project Gateway is a proposed data center project in Prichard, Mobile County, Alabama. Edged is named as operator. It was announced at 8 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Prichard, Mobile County, Alabama. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Bills and laws in Alabama
- SB 270 · Signed into law · Apr 17, 2026Requires data center power contracts to repay their own costs
- SB 265 · Died or failed · Apr 9, 2026Senate companion to HB 399 on data center tax abatements (not enacted)
- HB 399 · Signed into law · Apr 9, 2026Limits data center tax abatements to 20 years, with a community-investment path to 30, and extends the program sunset to 2032
- HB 403 · Died or failed · Mar 31, 2026House companion to SB 270 on PSC review of data center power contracts (not enacted)
Who's involved
- Developer and operatorEdged
Power
Capacity, as announced or filed
- 8 MW · Proposed buildingNov 2026 · what the figure measures is not stated
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Edged Project Gateway?
- Edged Project Gateway is a data center project in Prichard, Mobile County, Alabama.
- Who operates Edged Project Gateway?
- Edged is named as the operator of Edged Project Gateway.
- How big is Edged Project Gateway?
- Edged Project Gateway was announced at 8 MW of capacity.
- What stage is Edged Project Gateway?
- Edged Project Gateway is proposed.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Project Gateway: Sustainable Data Center Development in Prichard, AL
Edged US (project site)Tier 4 · Captured 2026-11-10 · Open the source - 2U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page