Project File
Edged Ankeny data center
Ankeny,Polk County,IowaUnder constructionFirst public 2025Filing entity: EdgedLast checked Nov 8, 2026
EdgedDeveloper and operatorBurns & McDonnellBuilder
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Edged Ankeny data center is a under-construction data center project in Ankeny, Polk County, Iowa. Edged is named as operator. It was first public in 2025. It was announced at 13.2 MW.
Edged Ankeny data center is an under-construction data center project in Ankeny, Polk County, Iowa. Edged is named as operator. It was announced at 13.2 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Ankeny, Polk County, Iowa. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
The land, to scale
Timeline
- · New projectFirst public record of Edged Ankeny data centerUnder construction
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iowa HF 976: Caps data center tax exemptions at 10 or 15 years
The act covers data center businesses whose backup power generation fuel is exempt only for the first ten years of operation of new construction completed, or additions made, on or after the effective date of the act, in a city with a population of more than thirty thousand; this project has 13.2 MW on record (IT load), but the project's construction or addition completion date and the population of its city is not on record.
“For backup power generation fuel purchased by a data center business in connection with real property with new construction upon the property completed on or after the effective date of this division of this Act, or additions upon existing property on or after the effective date of this division of this Act, and such property is located entirely or in part within a city having a population of more than thirty thousand, according to the most recent decennial federal census, the first ten years of operation in connection with the new construction or addition upon the existing property.” (Division XII, section 73, amending section 423.3, subsection 95, paragraph a, subparagraph (2) (b) (ii))
Rule checks: Project is in Iowa. Still to check: who it covers: not checked
Bills and laws in Iowa
- HF 976 · Signed into lawCaps data center tax exemptions at 10 or 15 years
- HF 2688 · Died or failedData centers must reinvest 5 percent of their tax breaks
- HF 2198 · Died or failedPublic disclosure of data center tax incentives
Who's involved
- Developer and operatorEdged
- BuilderBurns & McDonnell
Power
Capacity, as announced or filed
- 13.2 MW · DSM01-1May 2025 · it_load
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Edged Ankeny data center?
- Edged Ankeny data center is a data center project in Ankeny, Polk County, Iowa.
- Who operates Edged Ankeny data center?
- Edged is named as the operator of Edged Ankeny data center.
- How big is Edged Ankeny data center?
- Edged Ankeny data center was announced at 13.2 MW of capacity. The site covers 17.5 acres.
- What stage is Edged Ankeny data center?
- Edged Ankeny data center is under construction. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Edged breaks ground on data center in Des Moines, Iowa
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source - 2Edged reduces scope of planned data center campus in Council Bluffs, Iowa
Data Center DynamicsTier 3 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page