Edged Ankeny data center

Ankeny,Polk County,IowaUnder constructionFirst public 2025Filing entity: EdgedLast checked Nov 8, 2026

EdgedDeveloper and operatorBurns & McDonnellBuilder

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Edged Ankeny data center is a under-construction data center project in Ankeny, Polk County, Iowa. Edged is named as operator. It was first public in 2025. It was announced at 13.2 MW.

Edged Ankeny data center is an under-construction data center project in Ankeny, Polk County, Iowa. Edged is named as operator. It was announced at 13.2 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Ankeny, Polk County, Iowa. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

13 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Polk County, Iowa.See every project on the map

The land, to scale

One football field
17.5 acres, about 13 football fields. Drawn as a square for scale; the real shape is not known.

Timeline

  1. · New projectFirst public record of Edged Ankeny data centerUnder construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iowa HF 976: Caps data center tax exemptions at 10 or 15 years

    The act covers data center businesses whose backup power generation fuel is exempt only for the first ten years of operation of new construction completed, or additions made, on or after the effective date of the act, in a city with a population of more than thirty thousand; this project has 13.2 MW on record (IT load), but the project's construction or addition completion date and the population of its city is not on record.

    “For backup power generation fuel purchased by a data center business in connection with real property with new construction upon the property completed on or after the effective date of this division of this Act, or additions upon existing property on or after the effective date of this division of this Act, and such property is located entirely or in part within a city having a population of more than thirty thousand, according to the most recent decennial federal census, the first ten years of operation in connection with the new construction or addition upon the existing property.” (Division XII, section 73, amending section 423.3, subsection 95, paragraph a, subparagraph (2) (b) (ii))

    Rule checks: Project is in Iowa. Still to check: who it covers: not checked

Bills and laws in Iowa

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 13.2 MW · DSM01-1May 2025 · it_load

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Edged Ankeny data center?
    Edged Ankeny data center is a data center project in Ankeny, Polk County, Iowa.
    Who operates Edged Ankeny data center?
    Edged is named as the operator of Edged Ankeny data center.
    How big is Edged Ankeny data center?
    Edged Ankeny data center was announced at 13.2 MW of capacity. The site covers 17.5 acres.
    What stage is Edged Ankeny data center?
    Edged Ankeny data center is under construction. It was first public in 2025.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Edged breaks ground on data center in Des Moines, Iowa
      Data Center Dynamics
      Tier 3 · Captured 2026-11-08 · Open the source
    2. 2
      Edged reduces scope of planned data center campus in Council Bluffs, Iowa
      Data Center Dynamics
      Tier 3 · Captured 2026-11-08 · Open the source