Project File

Digi Power X Columbiana AI Data Center

Columbiana,Shelby County,AlabamaUnder constructionLast checked Nov 8, 2026

Digi Power XDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Digi Power X Columbiana AI Data Center is a under-construction data center project in Columbiana, Shelby County, Alabama. Digi Power X is named as operator. It was announced at 40 MW.

Digi Power X Columbiana AI Data Center is an under-construction data center project in Columbiana, Shelby County, Alabama. Digi Power X is named as operator. It was announced at 40 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Columbiana, Shelby County, Alabama. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

40 MWAnnounced capacity
0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Shelby County, Alabama.See every project on the map

Bills and laws in Alabama

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 40 MW · Full facility (Phases 1 and 2)Oct 2026 · what the figure measures is not stated

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Digi Power X Columbiana AI Data Center?
    Digi Power X Columbiana AI Data Center is a data center project in Columbiana, Shelby County, Alabama.
    Who operates Digi Power X Columbiana AI Data Center?
    Digi Power X is named as the operator of Digi Power X Columbiana AI Data Center.
    How big is Digi Power X Columbiana AI Data Center?
    Digi Power X Columbiana AI Data Center was announced at 40 MW of capacity.
    What stage is Digi Power X Columbiana AI Data Center?
    Digi Power X Columbiana AI Data Center is under construction.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Digi Power X Announces $200 Million Debt Financing Commitment to Support Completion of Alabama AI Data Center and Provides Expansion Update
      Digi Power X Inc. (via ACCESS Newswire)
      Tier 4 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page