CyrusOne SAT5-SAT6 campus, San Antonio

San Antonio,Bexar County,TexasOperatingFirst public 2021Filing entity: CyrusOneLast checked Nov 10, 2026

CyrusOneDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

CyrusOne SAT5-SAT6 campus, San Antonio is an operating data center project in San Antonio, Bexar County, Texas. CyrusOne is named as operator. It was first public in 2021. It was announced at 33 MW.

CyrusOne SAT5-SAT6 campus, San Antonio is an operating data center project in San Antonio, Bexar County, Texas. CyrusOne is named as operator. It was announced at 33 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in San Antonio, Bexar County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

33 MWAnnounced capacity
1Public records we have found
112,175Floor area, sq ft

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of CyrusOne SAT5-SAT6 campus, San Antonio in San Antonio, Bexar County, Texas, captured 2022
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2022Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Bexar County, Texas.See every project on the map

Timeline

  1. · FilingFiled with Texas Department of Licensing and Regulation for CyrusOne SAT5-SAT6 campus, San AntonioTABS2021014441
  2. · New projectFirst public record of CyrusOne SAT5-SAT6 campus, San AntonioOperating

Bills and laws in Texas

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 33 MW · Nov 2026 · it_load

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Texas Department of Licensing and Regulation, TABS2021014441

    Floor area
    112,175 sq ft
    Stated in the filing
    $50 million

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is CyrusOne SAT5-SAT6 campus, San Antonio?
CyrusOne SAT5-SAT6 campus, San Antonio is a data center project in San Antonio, Bexar County, Texas.
Who operates CyrusOne SAT5-SAT6 campus, San Antonio?
CyrusOne is named as the operator of CyrusOne SAT5-SAT6 campus, San Antonio.
How big is CyrusOne SAT5-SAT6 campus, San Antonio?
CyrusOne SAT5-SAT6 campus, San Antonio was announced at 33 MW of capacity.
What stage is CyrusOne SAT5-SAT6 campus, San Antonio?
CyrusOne SAT5-SAT6 campus, San Antonio is operating. It was first public in 2021.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    TABS project record: CyrusOne-SAT VI TRP 2, 14719 Omicron Dr, San Antonio
    Texas Department of Licensing and Regulation
    Tier 1 · Captured 2026-11-10 · Open the source
  2. 2
    CyrusOne data center page: San Antonio SAT5-SAT6
    CyrusOne
    Tier 2 · Captured 2026-11-10 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page