Project File
Core Scientific Denton
Denton,Denton County,TexasExpandingLast checked Nov 13, 2026
Core ScientificDeveloper and operatorCoreWeaveEnd user
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Still to confirm: Electric utility
- Still to confirm: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Core Scientific Denton is an expanding data center project in Denton, Denton County, Texas. Core Scientific is named as operator. It was announced at 371 MW.
Core Scientific Denton is an expanding data center project in Denton, Denton County, Texas. Core Scientific is named as operator. It was announced at 371 MW. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Denton, Denton County, Texas. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Texas SB 6: Sets grid connection and cost rules for large loads in Texas
The reliability service covers large load customers in the ERCOT power region with a demand of at least 75 megawatts, and bars customers that curtail in response to wholesale prices or take part in another reliability or ancillary service; this project has 371 MW announced on record, but its demand as the service measures it and its participation in another reliability or ancillary service are not on record.
“The commission shall require the independent organization certified under Section 39.151 for the ERCOT power region to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated emergency condition.” (SECTION 4, Utilities Code Sec. 39.170(b))
Rule checks: Project is in Texas; 371 MW on record (announced), threshold 75 MW (SECTION 2, Utilities Code Sec. 37.0561(c)). Still to check: who it covers: not checked
Bills and laws in Texas
- SB 6 · Signed into law · Jun 20, 2025Sets grid connection and cost rules for large loads in Texas
- SB 2222 · Died or failed · Mar 25, 2025Would exempt data center property and energy equipment from property tax
Who's involved
- Developer and operatorCore Scientific
- End userCoreWeave
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Core Scientific Denton?
- Core Scientific Denton is a data center project in Denton, Denton County, Texas.
- Who operates Core Scientific Denton?
- Core Scientific is named as the operator of Core Scientific Denton.
- How big is Core Scientific Denton?
- Core Scientific Denton was announced at 371 MW of capacity.
- What stage is Core Scientific Denton?
- Core Scientific Denton is expanding.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Core Scientific Form 8-K: Texas Data Center Power Status Update
Core Scientific, Inc. (SEC Form 8-K)Tier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page